| 02/05/2013 | MARTIN BROWN | FIRE | REVIEW | Denied | A Fire Alarm system is required. Refer to 2012 International Fire Code, section 1103.7.6. Please amend plans to indicate installation of a complete manual fire alarm system. |
| 02/13/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET T-1; PROJECT DATA (BUILDING CODES): THE ACCESSIBILITY CODE USED FOR THIS REVIEW IS THE ICC/ANSI A117.1-2009. REVISE NOTE. 2. SHEET T-1; PROJECT DATA (BUILDING AREA): THE EXISTING BUILDING AREA IS REVISED ON ONE SET OF THE DRAWINGS ONLY. REVISE THE SECOND SET. 3. SHEET T-1; PROJECT DATA (BUILDING AREA): BOTH BUILDINGS ARE LISTED AS "EXISTING NORTH BUILDING". REVISE. 4. SHEET A100; SITE DEMOLITION NOTES: REVISE NOTE 14. 5. SHEET A100; SITE DEMOLITION NOTES: REVISE NOTE 18. 6. SHEET A100; SITE NOTES: NOTE 2 WAS NOT LOCATED ON THE PLAN. VERIFY. 7. SHEET A101: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE GENERAL NOTES AND THE DEMOLITION PLAN NOTES. 8. SHEET A101; DEMOLITION PLAN NOTES: INDICATE NOTE 6 IN UNIT "TYPE E". 9. SHEET A101; DEMOLITION PLAN NOTES: INDICATE NOTE 9 IN UNIT "TYPE E". 10. SHEET A101; DEMOLITION PLAN NOTES: NOTE 10 WAS NOT LOCATED IN ANY UNIT. VERIFY. 11. SHEETS A102, A103, A104, A105, AND A106: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE GENERAL NOTES AND THE KEYNOTES. 12. SHEETS A102, A103, A104, AND A105: WHERE A NOTE IN THE UNITS INDICATES "SEE TYPE B (OR C OR D) WITH KEYNOTES FOR MORE INFORMATION", GIVE A SPECIFIC SHEET REFERENCE FOR THE LOCATION OF THAT INFORMATION. 13. SHEETS A102, A103, A104, AND A105: IN NOTE 1, PROVIDE THE WALL STUD SIZE AND SPACING. 14. SHEETS A102, A103, A104, AND A105; KEYNOTES: PROVIDE A NOTE THAT INDICATES KEYNOTES LISTED MAY APPEAR ON ANOTHER SHEET. 15. SHEETS A102, A103, A104, AND A105; KEYNOTES: IN NOTE 2, PROVIDE THE WALL STUD SIZE AND SPACING. 16. SHEETS A102, A103, A104, AND A105; KEYNOTES: NOTE 22 WAS NOT LOCATED ON THE PLANS. VERIFY. 17. SHEETS A102, A103, A104, AND A105; KEYNOTES: IN NOTE 27, PROVIDE THE FURRING SIZE AND SPACING. 18. SHEET A106: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE SECTION AND ELEVATION NOTES. 19. SHEET GSN: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THE FASTENING SCHEDULE. 20. SHEET GSN; STUDS AND POSTS: PROVIDE INTERIOR BEARING WALL AND NON-BEARING WALL STUD SIZES, OR GIVE A REFERENCE. 21. SHEET S1.0; NORTH FOUNDATION PLAN: A WOOD POST IS INDICATED NEAR THE MATCH LINE, BUT DOES NOT SHOW UP ON THE DRAWING. PROVIDE. 22. SHEETS S2.0 AND S2.1 (FRAMING PLANS); SHEET SD1 (DETAIL 15): THE PLANS INDICATE A 4" X 1/4" STEEL WALL SUPPORT STRAP AT THE FLOOR, WHILE DETAIL 15 INDICATES A 3" X 1/4" STRAP. VERIFY. 23. SHEETS S2.2 AND S2.3 (FRAMING PLANS); SHEET SD1 (DETAIL 15): THE PLANS INDICATE A 4" X 1/4" STEEL WALL SUPPORT STRAP AT THE ROOF, WHILE DETAIL 15 INDICATES A 1 1/2" X 1/4" STRAP. VERIFY. 24. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 02/20/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Tucson Water limits a 2" meter to a maximum demand of 120 GPM. The water demand calculations show an existing fixture count of 375 (100 GPM demand) with a future fixture count of 631 for a total demand of approximately 148 GPM. Provide a letter from Tucson Water confirming that the use of a 2" water meter will be allowed for this project. 2. Clarify the design of the proposed water service; on sheet P201 the service pipe is 2-1/2" with a 2-1/2" RPBP but the water pressure calculations on sheet P301call for a 2" RPBP served by an existing 3" water line. (Note that the pressure loss for the specified 2-1/2" RPBP would be in excess of 13 PSI for the calculated demand.) |
| 02/20/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a floor drain (minimum size shall be 3") for the laundry room per Section 412.4, IPC 2012. 2. Show the size, route and termination of the T&P relief piping for the water heaters serving the apartments. Reference: Section 504, IPC 2012. 3. Provide a watertight pan of galvanized steel (minimum 24-gage) or other approved material under the water heaters located on the second floor level with drains to an approved location. Reference: Section 504.7, IPC 2012. 4. Provide cleanouts sized per Section 708.7, IPC 2006 (e.g. a 4" pipe requires a 4" cleanout). 5. Indirect waste receptors shall be not be installed in bathrooms, toilet rooms, or in inaccessible or unventilated spaces (e.g. cupboards, storerooms, or closets). Indirect waste receptors shall have ready access. Reference: Section 802.3, IPC 2012. |
| 02/20/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide a programmable thermostat for each air handler that complies with the requirements of Sections R403.1.1 and R403.1.2, IECC 2012. 2. Show the complete specifications for each heat pump system, including the SEER for each split system, any supplemental heaters, and the air leakage rating of the air handler (ASHRAE Standard 193). Reference: Sections R103.2 and R403.2.2.1, IECC 2012. 3. Provide thermal load and HVAC equipment-sizing calculations to confirm the specified heat pumps for each apartment type. Reference: Section R403.6, IECC 2012. 4. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top heat pump units. Reference: Section 302.1, IMC 2012. 5. Provide structural details to show how the air handlers are to be connected to the building structure. Reference: Section 302.1, IMC 2012. 6. Show the size, routing, and termination of the primary and secondary condensate drains for the air handlers. Reference: Sections 307.2, IMC 2012 as amended by the City of Tucson 7. Show how ventilation is to be provided for each apartment. Reference: Section 401.2, IMC 2012. |
| 02/21/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM00509 811 N Alvernon Wy Montclair Apartments 1. What type of light fixtures are to replacing existing in the outdoor walkways. Since the building is being rewired these fixtures need to comply with the 2012 City of Tucson Outdoor Lighting Code. If these fixtures are of a Full Cut off type and under the canopy or roof, they may be exempt from the allowable lumen count , provide a cut sheet of the fixture. 2. Provide circuit numbers for all electrical in the individual units on Sheet E203. 3. The dryer circuits shown on Sheet E201 are not the same as ones listed in the panel schedule on Sheet E302. 4. Indicate on the electrical plans that the installation is to comply with the 2011 NEC and 2012 I Codes. Ray T Majuta PDSD, Tucson, Elect Plan Review 2/22/2013 Ray.Majuta@tucsonaz.gov |
| 02/25/2013 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Approved | Structure not impacted by local floodplain. Interior remodel only - approved for Engineering review. - Elizabeth Leibold |