Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T13CM00175
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/11/2013 | TERRY STEVENS | ZONING | REVIEW | Approved | |
01/11/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
01/18/2013 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Clarify the deferred submittal request for the lightweight awnings. 2) PP A1.1 a) keynote 7 does not apply in this instance. you must meet IBC section 1109 requirements for accessibility at the shower. b) Keynote 14 -- assumed reference is 3/A1.1 provide gauge of steel & height of wall. c) Clarify wall type below mezzannine. 3) PP A3.1 a) Fully dimension enlarged floor plan. b) Note that other items on thes page may be for reference only. Plans are not reviewed for compliance with the Amercian Disablitiy Act nor are are accessibility standards reviewed per the ADAAG. All accessibility reviews have been done per IBC accessibiltiy requirements using the adopted ANSI 117.1 standards. 4) PP A5.1 perspective view 2 does not correlate with strucural drawings. Coordinte. 5) Provide structural calculations to justify all design work. 6) Coordinate Structural and Architectural pages as to which mezzanines are new and which are existing. 7) Indicate on plans extent of existing mezzanine to be removed. 8) PP S4.1 a) Provide sufficient information @ detail 404 for the rebuilding of existing wall (what is the topplate steel?) b) Clarify how 18ga strap is continuous in detail 404. Provide width of strap if intent is to screw one side into joist and one side into topplate. c) Show gutters or roof drains for new flat roof section. |
01/22/2013 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide envelope compliance certificate |
01/22/2013 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | provide electrical plans |
01/22/2013 | LHANLY1 | WATER | REVIEW | Approved | |
01/22/2013 | LEERAY HANLY | ADA | REVIEW | Passed | |
01/22/2013 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
01/22/2013 | LHANLY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
02/11/2013 | FRODRIG2 | WWM | REVIEW | Needs Review | |
02/11/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/11/2013 | SHANAE POWELL | APPROVAL SHELF | Completed |
02/11/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |