Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T13CM00175
Parcel: 124150070

Address:
802 E 16TH ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM00175
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/11/2013 TERRY STEVENS ZONING REVIEW Approved
01/11/2013 LOREN MAKUS ENGINEERING REVIEW Approved
01/18/2013 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied 1) Clarify the deferred submittal request for the lightweight awnings.

2) PP A1.1
a) keynote 7 does not apply in this instance. you must meet IBC section 1109 requirements for accessibility at the shower.

b) Keynote 14 -- assumed reference is 3/A1.1 provide gauge of steel & height of wall.

c) Clarify wall type below mezzannine.

3) PP A3.1
a) Fully dimension enlarged floor plan.

b) Note that other items on thes page may be for reference only. Plans are not reviewed for compliance with the Amercian Disablitiy Act nor are are accessibility standards reviewed per the ADAAG. All accessibility reviews have been done per IBC accessibiltiy requirements using the adopted ANSI 117.1 standards.

4) PP A5.1 perspective view 2 does not correlate with strucural drawings. Coordinte.

5) Provide structural calculations to justify all design work.

6) Coordinate Structural and Architectural pages as to which mezzanines are new and which are existing.

7) Indicate on plans extent of existing mezzanine to be removed.

8) PP S4.1

a) Provide sufficient information @ detail 404 for the rebuilding of existing wall (what is the topplate steel?)

b) Clarify how 18ga strap is continuous in detail 404. Provide width of strap if intent is to screw one side into joist and one side into topplate.

c) Show gutters or roof drains for new flat roof section.
01/22/2013 LEERAY HANLY MECHANICAL-COMMERCIAL REVIEW Denied Provide envelope compliance certificate
01/22/2013 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Denied provide electrical plans
01/22/2013 LHANLY1 WATER REVIEW Approved
01/22/2013 LEERAY HANLY ADA REVIEW Passed
01/22/2013 LEERAY HANLY PLUMBING-COMMERCIAL REVIEW Approved
01/22/2013 LHANLY1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
02/11/2013 FRODRIG2 WWM REVIEW Needs Review
02/11/2013 KEN BROUILLETTE FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/11/2013 SHANAE POWELL APPROVAL SHELF Completed
02/11/2013 SHANAE POWELL OUT TO CUSTOMER Completed