Review Date Reviewer's Name Type of Review Description Status Comments
10/05/2012 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
10/05/2012 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied
10/10/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Denied ACTIVITY NUMBER: T12PI00013
PLANS # I-2012-012
PROJECT NAME:Senior Care Facility Tanque Verde & Catalina
PROJECT ADDRESS:
PROJECT REVIEWER: Matthew Geweke

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal.

The following items must be revised or added to the plan.

- Include a response letter with the next submittal that states how all comments have been addressed.

- See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

- I do suggest an office meeting to discuss finer details of the intersection improvement.

If you have any questions, I can be reached at 791-4259 or Matthew.Geweke@tucsonaz.gov or my supervisor Mr. Jose.Ortiz@tucsonaz.gov
10/26/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this project and have the following comments:

1. Sheet 1 - The sheet numbers shown on the cover page do not correspond to the actual sheet that the information is on.

2. Sheet 5 - Paving Detail - This detail calls for 2 inches over 4 inches of ABC. I would like you to match the pavement section of Tanque Verde for the portion northof the concrete valley gutter and for the patch to the east of the drive. The proposed paving section is fine for the area south of the concrete valley gutter.

No further comments.

Lance Peterson
10/31/2012 RICHARD LEIGH DOT ENGINEERING REVIEW Denied October 31, 2012

SUBJECT: Tanque Verde Rd and Catalina Highway - I-2012-012, T12PI00013

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan not recommends approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2012-012" in title block of each sheet.

2. Include Development Services Department PIA activity number (T12PI0013) on cover sheet.

3. Correct Grading Notes #3 to include final testing and acceptance to be performed by TDOT Engineering.
4. All pavement within existing Tanque Verde Roadway prism shall match existing pavement section.

5. Show radii of both corners as indicated.

6. Dimension all sidewalk widths.

7. Per COT SD200 sidewalk shall have a max 3:1 taper. Both corners indicated appear to have a 1:1 taper.

8. Plans show the ADA Ramp landing on the southeast corner does not have the minimum slope requirements per SD 207. Please revise so drainage is always towards the pavement and not onto the landing.

9. Add Sight Visibility Triangles at intersections.

10. Add Spandrels to Valley Gutter per SD208.
11. Call out pavement section for new driveway.

12. Pavement section needs to match the Geotechnical recommendations at a minimum.

13. Curb along Tanque Verde from Sta. 21+26.79 Rt. to 22+36.22 Rt. Needs to match existing Type 1 Curb. Correct keynote 1 to reflect Type 1 Curb.

14. Add keynote 8 " 6" Type 1G Vertical Curb and Gutter per SD209.

15. Curb raddi at Catalina Highway & Tanque Verde shall be Type 1G from BCR to ECR and transition on-site to Type2 Vertical Curb.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsoz.gov
11/06/2012 GARY WITTWER DOT LANDSCAPE REVIEW Approv-Cond We are not sure if we have any irrigation in this area. If we do it will be lateral lines and they should be sleeved (4" PVC sch. 40) under driveway.
11/28/2012 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
11/28/2012 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed