Plan Number: T12PI00009
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T12PI00009
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/30/2012 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
04/30/2012 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
04/30/2012 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
05/02/2012 GARY WITTWER DOT LANDSCAPE REVIEW Approved
05/31/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond 31 May 2012
ACTIVITY NUMBER: T12PI00009
PROJECT NAME: TYNDALL AVE. HOUSING OFF-SIGHT 1
PROJECT ADDRESS: 1020 N Tyndall Ave.
PROJECT REVIEWER: Matthew Geweke, Traffic Eng. Tech.


Conditional Acceptance:
Traffic Engineering recommends conditional approval of the PIA Plan; therefore a revised PIA Plan is not necessarily required for re-submittal but the following items must be revised or added to the plan. Just a email response with an exchange of PDF's is acceptable in lieu of a re-submittal.

1. See redlines on the submitted drawings and address the additional redline comments on Sht. 2 regarding Keynote #5 and Sht. 6 regarding the a Traffic Eng. Signing note.

If you have any questions, I can be reached at 791-4259 x76665 or Matthew.Geweke@tucsonaz.gov
06/01/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond This alley is an area that floods every monsoon season. Are these improvements designed to eliminate this flooding or just reduce the issues? Thanks

Lance Peterson
Streets and Traffic Maintenance
(520)837-6777
06/05/2012 RICHARD LEIGH DOT ENGINEERING REVIEW Denied May 25, 2012

SUBJECT: TYNDALL HOUSING OFFSITE IMP U-2012-006 T12PI00009, 1st Rev.

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

Permits and Codes Section has reviewed the PIA plan set for the subject project and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. Please provide a written response to each comment and return red line drawings with re-submittal.

1. Include the plan number "U-2012-006" in title block of each sheet.

2. Include Development Services Department PIA activity number "T12PI00009" on cover sheet.

3. Change title in the title blocks of sheets 2 through 11 to be identical as sheet 1. Specific sheet details may be placed above title block.

4. Lighten line and hatching weights for all existing roadway infrastructure.

5. Provide a detail for transitioning from vertical to cub and gutter. Transition lengths shall be a minimum of five feet.

6. Provide pavement structural section detail for each type proposed pavement section.

7. Sheet 2: Show and label all existing utility infrastructure (poles, cabinets pull boxes, etc.) within the right-of-way and indicate as to their disposition if conflicting with proposed improvements

8. Sheet 2: Provide a detail or reference a standard detail of each type of curb access ramp proposed.

9. Sheet 2: Having parking meters located in the water harvesting/landscaping area may pose a hazard to pedestrians. Clearly show how ADA access will be provided to the meters the meters.

10. Sheet 2: Provide a cross section of the grate structure across the water harvesting area. The drop off from the grate structure may pose a hazard to pedestrians.

11. Sheet 3: A dry well is not a normally acceptable option within the public right-of-way due to the high maintenance required. Please investigate and peruse other options to the drainage problem.

12. Sheet 4: Indicate that the curb access ramp at the northwest corner of First St and Alley will be replaced per PC/COT SD 207.

13. Sheet 4: Will reconfiguration of the grades in the alley adversely impact the properties to the east.

14. Sheet 9: Indicate the brick pavers will be placed per Standard Specifications for Public Improvement Section 932

15. Sheet 9, Dtl 2 & 5: Provide grate details and indicate model and manufacturer. Grates need to be pedestrian safe

16. Sheet 9, Dtl. 2 & 5: Indicate grate anchoring specifications.

Please refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
06/06/2012 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
06/06/2012 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed