Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T12PI00008
Parcel: Unknown

Address:
2350 N 1ST AV

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T12PI00008
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/27/2012 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
04/27/2012 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
04/27/2012 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
04/27/2012 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
04/27/2012 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
04/27/2012 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
05/02/2012 GARY WITTWER DOT LANDSCAPE REVIEW Denied No Landscape / Irrigation plan submitted
05/14/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied I have reviewed this submittal and have the following comments:

1. Sheet 2 - Grant Road Detail calls out a construction note number 13 in several locations but I could not see the sewer manhole the note references. Is this note correct?
2. Sheet 3 - The curb transition detal; - This detail does not show truncated domes at the drive. Are they required at this location?
3. Sheet 4 - Hampton Street - This detail calls out construction note number 13 again but I do not see the sewer manhole that this note references. Is this correct?
4. Sheet 4 - Traffic Circle - Who will be responcible for the maintenance of the landscaping in this traffic circle?

No further comments.

Lance Peterson
05/30/2012 BLANCA ESPINO DOT ENGINEERING REVIEW Denied
05/31/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Denied May 31, 2012
ACTIVITY NUMBER: T12PI00008
PROJECT NAME: Walgreens
PROJECT ADDRESS: Grant and 1st
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. See redlines on the submitted drawings (pages 4 & 5) and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.


If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
06/01/2012 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Completed
06/04/2012 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
06/04/2012 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed
06/19/2012 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
06/19/2012 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed