Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T12PI00006
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/03/2012 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | Additional Signs required - Begin Right Turn Yield to Bikes (R4-4) 2 Righ Turn Lane Must Turn Right (R3-7R) No X-walk markings required. |
| 05/03/2012 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 05/03/2012 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | May 2, 2012 ACTIVITY NUMBER: T12PI00006 PROJECT NAME: SalPointe High School PROJECT ADDRESS: Glenn and Cherry PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
| 05/08/2012 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 05/08/2012 | BLANCA ESPINO | DOT ENGINEERING | REVIEW | Denied | 1. Add the assigned PIA plan number T12PI00006. See redlines. 2. In title block, add assigned Plan Number, I-2012-005 to all sheets. See redlines. 3. Indicate the assigned development plan number. See redlines. 4. Submit a copy of the approved development plan from COT-Planning & Development Services Department with the next submittal. 5. Sheet 1, Legend; include all lines used in drawing. Use the proper line weight. 6. Sheet 1, Site Location Map; remove Plat information. Indicate street names. See redlines. 7. Sheet 2, All Easements, dedications, right-of-way should be depicted in plan view and labeled with recordation information (docket/page or plat book/page) prior to approval. See redlines. 8. Sheet 2, A minimum of 1-foot (2 foot Preferred) buffer must be provided between top of slope and sidewalk (natural slopes). Indicate slope and slope treatment. 9. Sheet 2, Delineate the proposed right-of-way. Also indicate drainage flow arrows. 10. Sheet 2, Keynote 6; Indicate proposed locations of street lights. Include electrical details on this plan set. 11. Proposed sidewalk will be a minimum of 6 feet wide on all collector streets and 5 feet wide on all local streets. Glenn Street is a collector street. Cherry Avenue is a local street. Revise sidewalk areas. 12. Sheet 3, Provide a detailed cross section for Bus Stop Loading Pad. 13. Sheet 3, Indicate the slope and slope treatment. See redlines. 14. Sheet 4, Detail 1; Indicate street and curb slope. 15. Sheet 4, See redlines and make corrections. 16. Utility Clearances must be submitted. Once changes, modifications, and or corrections are made to the PIA plan resubmitted and reviewed, further comments may result. If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov |
| 05/09/2012 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 05/09/2012 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approv-Cond | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 05/09/2012 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 05/09/2012 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied |