Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T12PI00006
Parcel: Unknown

Address:
1545 E COPPER ST

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T12PI00006
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/03/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Denied Additional Signs required -
Begin Right Turn Yield to Bikes (R4-4)
2 Righ Turn Lane Must Turn Right (R3-7R)
No X-walk markings required.
05/03/2012 BESPINO1 UTILITY CLEARANCES COT STREETS DIVISION Denied
05/03/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Denied May 2, 2012
ACTIVITY NUMBER: T12PI00006
PROJECT NAME: SalPointe High School
PROJECT ADDRESS: Glenn and Cherry
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.


If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
05/08/2012 GARY WITTWER DOT LANDSCAPE REVIEW Approved
05/08/2012 BLANCA ESPINO DOT ENGINEERING REVIEW Denied 1. Add the assigned PIA plan number T12PI00006. See redlines.

2. In title block, add assigned Plan Number, I-2012-005 to all sheets. See redlines.

3. Indicate the assigned development plan number. See redlines.

4. Submit a copy of the approved development plan from COT-Planning & Development Services Department with the next submittal.

5. Sheet 1, Legend; include all lines used in drawing. Use the proper line weight.

6. Sheet 1, Site Location Map; remove Plat information. Indicate street names. See redlines.

7. Sheet 2, All Easements, dedications, right-of-way should be depicted in plan view and labeled with recordation information (docket/page or plat book/page) prior to approval. See redlines.

8. Sheet 2, A minimum of 1-foot (2 foot Preferred) buffer must be provided between top of slope and sidewalk (natural slopes). Indicate slope and slope treatment.

9. Sheet 2, Delineate the proposed right-of-way. Also indicate drainage flow arrows.

10. Sheet 2, Keynote 6; Indicate proposed locations of street lights. Include electrical details on this plan set.
11. Proposed sidewalk will be a minimum of 6 feet wide on all collector streets and 5 feet wide on all local streets. Glenn Street is a collector street. Cherry Avenue is a local street. Revise sidewalk areas.

12. Sheet 3, Provide a detailed cross section for Bus Stop Loading Pad.

13. Sheet 3, Indicate the slope and slope treatment. See redlines.

14. Sheet 4, Detail 1; Indicate street and curb slope.

15. Sheet 4, See redlines and make corrections.

16. Utility Clearances must be submitted.


Once changes, modifications, and or corrections are made to the PIA plan resubmitted and reviewed, further comments may result. If you have any questions, I can be reached at 837-6634 or Blanca.Espino@tucsonaz.gov
05/09/2012 BLANCA ESPINO PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
05/09/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approv-Cond
05/09/2012 BESPINO1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
05/09/2012 BLANCA ESPINO PIA COORDINATOR OUT TO CUSTOMER Completed
05/09/2012 BESPINO1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
05/09/2012 BESPINO1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
05/09/2012 BESPINO1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
05/09/2012 BESPINO1 UTILITY CLEARANCES COX COMMUNICATION Denied
05/09/2012 BESPINO1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
05/09/2012 BESPINO1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
05/09/2012 BESPINO1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied