Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T12PI00005
Review Name: PIA - SUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
| 03/26/2012 | BESPINO1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | |
| 04/12/2012 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | Nice work Gordo |
| 05/02/2012 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | May 2, 2012 ACTIVITY NUMBER: T12PI00005 PROJECT NAME: Headley/Midvale Park PROJECT ADDRESS: Headley at Midvale Park PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering recommends a conditional approval of the PIA Plan; therefore revisions to the plans are required prior to the submittal of mylars. The following items must be revised or added to the plan. 1. Place the PIA activity number to the cover sheet of the plans. 2. Sheet 3: Section View of 'Landscape parking island curb and header placement' needs to have a curb transition at the inlet into the landscape island. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
| 05/02/2012 | BLANCA ESPINO | DOT ENGINEERING | REVIEW | Denied | 1.Sheet 1, Add the assigned PIA plan number T12PI00005. In title block, add assigned Plan Number, I-2012-004 to all sheets. See redlines. 2.Sheet 1, remove the text encompassed with red ink on the project title and title block. 3.Sheet 3, Detail Plan View, indicate the finished surface treatment. Also indicate a callout number or letter for the cross section detail. 4.Sheet 3, Detail Section View, indicate location of this view. Indicate curb height. 5.Include a copy of the Landscape Improvement plans with next submittal. 6.Engineer of Record must provide written documentation that all utilities within the right of way have been cleared for construction. 7.All curb access ramps being impacted by new sidewalk must be A.D.A. compliant. 8.Indicate a dimensioned detail for the area drain structure and pipe to be placed in the right-of-way within the landscaped area. |
| 05/03/2012 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 06/27/2012 | BLANCA ESPINO | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 06/27/2012 | BLANCA ESPINO | PIA COORDINATOR | OUT TO CUSTOMER | Completed |