Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T12PI00003
Parcel: Unknown

Address: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T12PI00003
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/03/2012 GARY WITTWER DOT LANDSCAPE REVIEW Approv-Cond
02/03/2012 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Completed
02/03/2012 JOSE ORTIZ DOT TRAFFIC REVIEW Approved
02/03/2012 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed See redline drawings for COT Landscaping comments.
02/03/2012 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
02/03/2012 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed See redline drawings for COT Landscaping comments.
02/03/2012 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond February 3, 2012


SUBJECT: Ajo Bus Pull Out U-2011-03 T11PI00003 1st Rev.

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

Permits and Codes Section has reviewed the PIA plan set for the subject project and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. Please provide a written response to each comment and include red line drawings with re-submittal.

1. Include the plan number "U-2012-003" in title block of each sheet.

2. Include Development Services Department PIA activity number "T12PI00003" on cover sheet.

3. Delineate ADOT right-of-way limits or Federal Access Control limits within if within the project area.

4. Use COT Bus Bay Standard Detail (Rev. 6/10) for construction details of the proposed Bus Bay. See attached.

5. Clearly label and reference cross section and details.

6. Lighten line weights for existing structures as per drawing legend.

7. Please submit copies of the PIA paving plans to the following utilities and provide this office with a Utility Plan Receipt from each of the utility companies:

City of Tucson Transportation Department, Streets Division
Tucson Water
Pima County, Wastewater Management
Qwest Communications
Tucson Electric Power
Southwest Gas Corp.
El Paso Natural Gas*
Kinder Morgan Energy*
* When the above two utilities are not involved, a form filled out with the "RECEIVED BY:" line stating "not needed" may be submitted.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
02/06/2012 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
02/06/2012 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed