Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T12OT01663
Review Name: FLOODPLAIN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | January 7, 2013 (No special Inspection Required). The applicant is authorized to use a portion of the flood hazard area (FEMA Zone AE, Panel 1720M) in the City of Tucson at 8650 East Woodland Road for the purpose of adding solar panels to an existing residential building. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions shall apply to this permit: 1. All work shall conform to the attached plans (T12CM07868) which are made part of this permit. 2. The construction cost of the improvements shall not exceed 50 per cent of the total appraised/assessed value of the existing structure, not including the land. The estimated cost of improvement (construction) is $67,689 based on an estimate by Arizona Solar Solutons. The assessed value (2013) of the existing structure is estimated to be $246,651 which is 65 per cent of the Pima County Assessor's full cash value of $513,085 less the estimated values of the barns and guesthouse. The cost of the improvements is 27 per cent of the value of the existing structure. 3. The existing drainage patterns at the property lines shall not be obstructed or changed. 4. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 5. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development. 7. No patio walls or any additional structures may be constructed within the Floodway. This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/10/2013 | SHANAE POWELL | OUT TO CUSTOMER | Completed |