Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T12OT01137
Review Name: FLOODPLAIN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/22/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | Revise the drainage statement floodplain delineation. The aerial photos of the site show a curb island and solid waste container enclosure upstream of cross-section 4. Revise the analysis to include a cross section at these obstruction and upstream of them as well. (SMDDFM Fig. 5.1) Provide details of the fence design to demonstrate that the clear openings in the area affected by the regulatory flows. Show how the gates will respond to potential clogging by debris carried downstream from the subdivision areas. Discuss the use of break-away latches or some other means for preventing adverse effects caused by clogging. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/05/2012 | CPIERCE1 | OUT TO CUSTOMER | Completed |