Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T12OT00427
Review Name: FLOODPLAIN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/12/2012 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Denied | DATE: April 12, 2012 TO: Carl Bueter, P.E., Cornerstone Environmental Group SUBJECT: Los Reales Landfill Facility 1st Floodplain Engineering Review LOCATION: Ward 5, Parcel 140-39-052C, 2850K REVIEWER: Elizabeth Leibold CASE NUMBER: D08-0055 (T12BU00348) ACTIVITY NUMBER: T12OT00348 SUMMARY: The floodplain use permit application package was submitted for review. Planning & Development Services Department Engineering Division has reviewed the received items and does not recommend approval of the Floodplain Use Permit until the following comments are addressed. FPUP COMMENTS: 1) DS Sec.10-02.14.5.8: Floodplain Section staff shall review post construction percolation test results, submitted prior to the issuance of a Certificate of Occupancy, in order to verify performance of the proposed subsurface retention system. Add as a note to plan. 2) DS Sec.10-02.14.5.9: Regarding drain down time for the subsurface retention system, the rate of drainage shall be based on the results of a standard percolation test and a factor of safety of two (i.e., divide the field-test percolation rate by two). Show on plans. 3) DS Sec.10-01.3.5.5.2: The design shall show details for the provision of sediment trapping that can be removed easily for disposal. Show on plans. 4) DS Sec.10-02: Address the following other drainage related comments: a. Assure all locations of proposed 100-yr floodplain are delineated and labeled. b. Assure plans have correct boundary data labeled. c. Address comments for T12BU00348 (ref: D08-0055) If you have questions please email, or call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Department |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/13/2012 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |