Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: BILLBOARD - BLDG/ELEC30days
Permit Number - T12EL00736
Review Name: BILLBOARD - BLDG/ELEC30days
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/16/2013 | GLENN MOYER | ADMINISTRATIVE | ADMIN REVIEW | Denied | BRC Comments Below are comments on the electrical repair submittal for COT ID# 85 at 5060 East 22nd Street (T12EL00736). Sheet 1 of 2 No comments. Sheet 2 of 2 1. Show replacement electrical service (panel, meter, meter socket, riser conduit & ground) at current location and attached to like replacement of customer-owned utility pole; provide for same-sized (or NEC minimum) replacement of existing wire/conduit from service panel on utility pole to the ballasts on primary billboard structure (new locations of weatherhead/conduit/ballasts on primary billboard structure accepted as shown). 2. Provide standard plan (top) view. 3. Conform the note about light fixture removal from the site to that contained in the Site Plan (Sheet 1). 4. Provide for time control load on one of the two available Panel Schedule circuits (controller load (shown as 6 v-a max) may already be included in the v-a calculation as the ballast input calc would otherwise be a total of 625 v-a (250x2x1.25); if so indicate with schedule entry on applicable circuit). 5. Clarify whether the existing and replacement panels come with the Tork EWZ103 time controller factory installed or whether the time controller is shop-installed into the 122MRPS panel; further clarify whether the manufacturer ships the 122PROG with a 122MRPS or 122PROG exterior identification plaque (the form of the three notes provided in these regards for the T12EL00706 resubmittal suffices). 6. Add standard note indicating that no junction boxes or other fixtures where wire connections are made shall be added or replaced other than those shown on plan. 7. In the New Electrical Riser Diagram, correct the number of #18 ballast wires between the two ballast tees (six (6) #18 wires rather than twelve (12)) or otherwise explain. |
12/26/2012 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
12/26/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/28/2013 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |