Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM08260
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/10/2013 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
01/14/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approv-Cond | 1. Exit Corridor shall be one-hour rated and all openings protected. 2. Fire alarm system may be necessary based on other occupancies in the building that submitted for review in 2013. 3. Entire building-First and second floor required to be fire sprinklered. |
01/17/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/25/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Indicate the demand that the water meter will be serving. Reference: Section 103.2.3, UPC 2006. |
01/25/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the plumbing code to be used for this activity; the project data on sheet A1.0 refers to both the 2006 IPC and the 2006 UPC. This review has been made using the 2006 UPC. 2. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006. 3. Complete detail 2/P1.0 to show the pipe sizes and the flow rate for the recirculation system (all currently shown as "X"). Reference: Section 103.2.3, UPC 2006. 4. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply and sanitary waste systems to become overloaded. Reference: Section 101.5.1, UPC 2006. |
01/25/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2006. 2. Show the size, routing, and termination of the condensate drains for the fan coils. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson. 3. Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference: Section 307.2.3 IMC 2006. |
01/29/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/08/2013 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED PSL PLAN WITH CHECKLIST NEED REVIEW FROM PC INDUSTRIAL WW NEED TYPE III SEWER CAPACITY LETTER NEED SIZE, LOCATION, IDENTIFICATION OF METERS ON BUILDING PLAN SUBMITTAL |