Review Date Reviewer's Name Type of Review Description Status Comments
01/08/2013 LOREN MAKUS ENGINEERING REVIEW Approved
01/09/2013 MARTIN BROWN FIRE REVIEW Approved
01/16/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. Detail 50/A9.2, please provide structural calculations for the water heater support.
2. Please clarify and coordinate the water heater support between details 50/A9.2 and 2/P1.0.
3. Please provide a section detail, support details and structural calculations for the supporting design of the Type 1 exhaust hood.
END OF REVEIW
01/25/2013 ROBERT SHERRY WATER REVIEW Denied Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Indicate the demand that the water meter will be serving. Reference: Section 103.2.3, UPC 2006.
01/25/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Clarify the plumbing code to be used for this activity; the project data on sheet A1.0 refers to both the 2006 IPC and the 2006 UPC. This review has been made using the 2006 UPC.
2. Provide plumbing plans for the new work, including gas piping, T&P relief pipe for the water heater, water isometrics and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006.
3. Complete detail 2/P1.0 to show the pipe sizes and the flow rate for the recirculation system (all currently shown as "X"). Reference: Section 103.2.3, UPC 2006.
4. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply and sanitary waste systems to become overloaded. Reference: Section 101.5.1, UPC 2006.
5. Clarify which fixtures are to be connected to the grease waste system as opposed to the sanitary waste system.
6. Revise the waste connection size for the sanitary floor drain P-2a in the fixture connection schedule to coordinate with the plumbing specifications. Reference: Section 316.4.1, UPC 2006.
7. Each vent pipe shall rise vertically to a minimum of 6" above the flood-level rim of the fixture it serves before offsetting horizontally. Reference: Section 905.3, UPC 2006.
01/28/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
01/28/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide structural details to show how the relocated fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2006.
2. Clarify the configuration and balancing of the grease exhaust ducts for Type I hood #2. It appears that the 2x10 duct changes to a 34x10 grease duct and then to a 34x12 grease duct. Somewhere between the 23x10 grease duct and the 34x10 grease duct, an additional 1200 CFM is somehow introduced into the ducts. How is this happening?
3. Clarify the configuration of the make up air ducts serving Type I hoods #1 and #2; how does the 36x22 make up air duct serve the six make up air ducts on the two Type I hoods?
4. Revise the size of the grease ducts to provide a minimum velocity of 1500 feet per minute at full flow conditions. Reference: Section 506.3.4, IMC 2006, as amended by the City of Tucson.
5. The exhaust fan schedule notes that EF-1 is to be controlled by a "VAV hood EMS panel"; verify that the minimum duct velocities will comply with the requirements of Section 506.3.4, IMC 2006, as amended by the City of Tucson.
6. Show the locations of the cleanouts for the grease ducts. Reference: Sections 506.3.8 and 506.3.9, IMC 2006.
7. Provide specifications for the proposed Type I and Type II hoods. The kitchen drawings are shop drawings and as such, are not a replacement for sealed drawings. (Also, the kitchen drawings are marked "Preliminary - not for construction".) Reference: Section 507.1, IMC 2006.
8. Provide structural calculations and details to show that the Type I and Type II hoods are supported from the building structure in accordance with Section 507.6, IMC 2006. Reference: Section 302.1, IMC 2006.
9. Verify that the Type I hood installation complies with Section 507.9, IMC 2006 for clearances. Wall type F calls for plywood backing and the J (stainless steel panels) notation for the wall covering does not indicate the extent of the wall covering (also, what is a "bar die" wall?).
02/08/2013 GERRY KOZIOL WWM REVIEW Denied NEED PSL PLAN WITH CHECKLIST
NEED REVIEW FROM PC INDUSTRIAL WW
NEED TYPE III SEWER CAPACITY LETTER
NEED SIZE, LOCATION, IDENTIFICATION OF METERS ON BUILDING PLAN SUBMITTAL