Permit Number: T12CM08171
Parcel: 117132170

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T12CM08171
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2016 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Label all pipe sizes. Reference: Section 107.2.1, IBC 2012.
2. The fixture drain serving an automatic clothes washer shall connect to a fixture branch that is at least 3 inches in diameter. Reference: Section 406.2, IPC 2012.
3. Verify the size of the horizontal drain (4" W BF) shown on plumbing plan 2/p1.1. If it is 4", provide a 4" cleanout. Reference: Section 708.7, IPC 2012.
4. Revise detail 1/p1.2 so that the minimum font size is 1/32" and the detail is legible. Clarify all notes on the detail that refer to "optional" accessories or "minimum" pipe sizes; state what is required. Reference: Section 107.2.1, IBC 2012.
5. Verify the total connected gas load; it is 435CFH on sheet p1.1 and 407 CFH on sheet p1.2. Reference: Section 107.2.1, IBC 2012.
03/02/2016 MARTIN BROWN FIRE REVIEW Approved
03/02/2016 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Show how the dryer installation complies with Section 504.5, IMC 2012.
03/22/2016 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
#1. Lettering font size must be 3/32" minimum.
#2. There appears to be printing errors making the registrant seal and areas thru-out the plans non legible.
#3. The panel schedule for panel 4H1 shows "New Panel", however the riser diagram shows it as existing. Please correct this.
#4. Please provide commentary as to the changes. The reference electrical plans include four plan sheets, making reference to Phase 1 and Phase 2 of this project.
#5. Provide full compliance with the IECC for interior lighting.
Ref: IBC sec. 107.2.1
03/31/2016 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. GENERAL: IT APPEARS EVERY ARCHITECTURAL AND STRUCTURAL SHEET HAS BEEN REVISED (PER SHEET a1.0 INDEX). PLEASE PROVIDE A LIST OF ALL SHEET REVISIONS, SPECIFICALLY INDICATING ALL CHANGES ON EACH SHEET (CLOUD ALL CHANGES).
2. GENERAL: INDICATE ALL REVISIONS TO THE STRUCTURAL CALCULATIONS AND INDICATE CALCULATION SHEET NUMBERS.
3. GENERAL: PROVIDE TWO SETS OF STRUCTURAL CALCULATIONS.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/10/2017 KROBLES1 OUT TO CUSTOMER Completed