Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T12CM08107
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/11/2013 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | This plan review done by LeeRay. Call 520-837-4906 with any questions. H100 Original comment #1 not resolved " Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 106.3.1 and 301.2, IPC 2006." H103 Original correction comment #2 not resolved "Revise the riser diagrams referenced for the restroom from "B" to "C" to coordinate with the fixture layout in the plumbing plan." Currently no riser diagram is referenced, and the closest match "C" is shown flowing the wrong direction. H106 Original correction comment #3 not resolved "Provide hot water for the mop sink. Reference: section 607.1, IPC 2006" New Correction Comment. Provide cleanouts sized per Section 708.7 IPC |
02/12/2013 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Complete recirculation of ventilation air from toilet rooms is prohibited. Reference: Section 403.2.1 (4), IMC 2012. 2. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted with no more than 10% exhausted air being recirculated. Reference: Section 403.2.1 (4), IMC 2012. |
02/13/2013 | LHANLY1 | WATER | REVIEW | Approved | |
02/13/2013 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T12CM08107 Building Plan (1st Review) TRANSMITTAL DATE: February 13, 2013 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the tenant improvement plan and it appears that the plan matches the shell building plan. 3. Once the shell building plan has been approved zoning will approve the tenant improvement plan. 3. Zoning will re-review the plan on the next submittal to insure compliance. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
02/13/2013 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/15/2013 | GERRY KOZIOL | WWM | REVIEW | Approved |