Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM08107
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2013 | RONALD BROWN | ADA | REVIEW | Passed | |
01/10/2013 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T12CM08107 Building Plan (1st Review) TRANSMITTAL DATE: January 10, 2013 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning has reviewed the tenant improvement plan and it appears that the plan matches the shell building plan. 3. Once the shell building plan has been approved zoning will approve the tenant improvement plan. 3. Zoning will re-review the plan on the next submittal to insure compliance. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
01/11/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | H100 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 106.3.1 and 301.2, IPC 2006. 2. Provide fixture descriptions for all plumbing fixtures (these were not included in the specifications). Reference: Section 402, IPC 2006. 3. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. Reference: Section 416.5, IPC 2006. H105 1. Provide fixture descriptions for all plumbing fixtures (these were not included in the specifications). Reference: Section 402, IPC 2006. 2. Revise the riser diagrams referenced for the restroom from "B" to "C" to coordinate with the fixture layout in the plumbing plan. 3. Show that the back-to-back installation of water closets (Diagram "C") complies with the requirements of Section 706.3, IPC 2006. H106 1. Provide fixture descriptions for all plumbing fixtures (these were not included in the specifications). Reference: Section 402, IPC 2006. 2. Revise the riser diagrams referenced for the restroom from "B" to "C" to coordinate with the fixture layout in the plumbing plan. 3. Provide hot water for the mop sink. Reference: section 607.1, IPC 2006. 4. Show that the back-to-back installation of water closets (Diagram "C") complies with the requirements of Section 706.3, IPC 2006. 5. Provide cleanouts sized per Section 708.7, IPC 2006 (see waste and vent diagram "D"). |
01/14/2013 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | |
01/17/2013 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/17/2013 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Complete recirculation of ventilation air from toilet rooms is prohibited. Reference: Section 403.2.1 (4), IMC 2012. 2. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted with no more than 10% exhausted air being recirculated. Reference: Section 403.2.1 (4), IMC 2012. |
01/17/2013 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | PROVIDE IECC LIGHTING COMPLIANCE CERTIFICATE |
01/17/2013 | LHANLY1 | WATER | REVIEW | Denied | |
01/17/2013 | LHANLY1 | FIRE | REVIEW | Approved | SEE RELATED ACTIVITY T12CM08106 |
01/17/2013 | LHANLY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
02/05/2013 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED TO PERMIT NEED TYPE III SEWER CAPACITY LETTER FOR SHELL NEED TO SHOW ON DRAWINGS |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/05/2013 | CPIERCE1 | REJECT SHELF | Completed |