Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T12CM07970
Parcel: 10408095C

Address:
700 W WETMORE RD

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T12CM07970
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/19/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
08/20/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Clarify at which location the drain from the evaporative cooler is to terminate: at the reclaim water collection sump (General Note #5, sheet CPL100) or the lavatory tailpiece (Keynote #7, sheet CMH101). [Initial comment: Show the size, routing, and termination of the drain for the evaporative cooler. Reference: Section 106.3.1, IMC 2006 as amended by the City of Tucson.]
08/20/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Venting for a sand/oil separator is intended to protect the separator from pressure fluctuations that could cause the separator to become air-bound, be subjected to siphoning, or accumulate flammable vapors. Provide venting per the manufacturer's recommendations. All vents shall drain back to the separator. Reference: Sections 905.2 and 1003.2, IPC 2006. [Initial comment: Provide a vent for the sand/oil interceptor. Reference: Section 1003.9, IPC 2006.]
2. Three inches is the minimum size for horizontal storm drainage piping (see Table 1106.3, IPC 2006 for 1% slope with 3" per hour rainfall). [Initial comment: Provide the roof drain design identified in keynote #3, CAR201. Reference: Section 106.3.1, IPC 2006.]
3. Provide a vent for the clothes washer standpipe (WM) trap and provide water hammer arrestors for the water supplies to the clothes washer. Reference: Sections 604.9, 901.2.1, and 1002.3 (5), IPC 2006.
08/21/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
09/05/2013 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Precision Toyota of Tucson
T12CM07960, T12CM07961, T12CM07967 & T12CM07970
Building Plan (1st Review)

TRANSMITTAL DATE: September 5, 2013

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning has reviewed the building plan for compliance with the development package and it appears that the building plan complies. But due to the amount of comments by other PDSD review agencies Zoning will not approve at this time

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

Final Status

Task End Date Reviewer's Name Type of Review Description
09/27/2013 CPIERCE1 REJECT SHELF Completed