Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T12CM07902
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/11/2013 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 02/22/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT: THE STRUCTURAL ANANLYSIS AND PROJECT DRAWINGS ARE CONFUSING. THE COVER LETTER FOR THE CALCULATIONS (STAMPED BY ANDREW T. HALDANE, PE) INDICATES THE STRUCTURAL CAPACITY (MODIFIED WITH PROPOSED EQUIPMENT) IS 92.6% (SUFFICIENT CAPACITY). THEN PAGES 4 AND 5 OF THE CALCULATIONS INDICATE THE POLE, EXISTING ANCHOR BOLTS, REINFORCING RODS, BASE PLATE, AND FOUNDATION PASS THE ANALYSIS. NOT UNTIL WE GET TO THE STRUCTURAL CALCULATIONS APPENDIX D DO WE KNOW A STRUCTURAL MODIFICATION IS BEING ADDED (SHEETS T-1, N-1, N-2, N-3, N-4, N-5, S-1, S-2, AND S-3). THESE SAME SHEETS ARE INCLUDED IN THE SUBMITTAL DRAWINGS. CLARIFY. AT WHAT POINT IN THE CALCULATIONS IS IT DETERMINED THAT THE EXISTING POLE, BASE PLATE, AND ANCHORS NEED TO BE REVISED? 2. SHEETS A-7, A-8, A-9, AND A-10: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE THESE SHEETS. 3. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/14/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 03/14/2013 | CPIERCE1 | REJECT SHELF | Completed |