Review Date Reviewer's Name Type of Review Description Status Comments
01/10/2013 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Lotus Garden - Solar Parking Structures
T12CM07800
Building Plan (1st Review)

TRANSMITTAL DATE: January 10, 2013

The proposed covered parking structures with solar have been reviewed for compliance with the Uniform Development Code (UDC), Administrative Manual (AM) & Technical Standards Manual (TSM). The following comments must be addressed prior to approval of the building plans:

1. A development package review will be required for site review. Start a work flow with the COT PDSD Permit Counter prior to resubmittal of the plans. Provide a copy of the last approved site plan with the area of work clouded. If a last approved site plan cannot be provided a new development package that meets the requirements of AM section 2-06.0.0 must be provided. If a last approved site plan cannot be provided Zoning recommends that you do not resubmit your building plans until the development package has been approved.

2. AM 2-06.4.9.H.5 Per UDC Section 7.4.6.D.1 the minimum two parking area access lane (PAAL) width for a PAAL that provides access to 90 degree parking, as shown on the plan, is twenty-four (24) feet.

3. AM 2-06.4.9.H.5 Per UDC Section 7.4.6.F.2.a.1 An open structure, such as a carport or covered pedestrian access path as measured from the closest part of the structure or roof overhang. That said show the required one (1) setback to the PAAL on the plan.

4. AM 2-06.4.9.O Provide side street perimeter yard setback dimension from the Sonoita Avenuce property line to the proposed covered parking structures.


If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
01/17/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. As per the 2006 IBC, Section 508.3.2 the requirements for building non-separated uses for fire separation and maximum allowable sizes are explained. Please have your registrant architect/engineer provide a code analysis to that effect and include this analysis on the drawings.
2. Construction of the shade structures right atop the property line requires a 1 hour fire separation as per the 2006 IBC, Table 602. Please provide an appeal to the building official to provide a fire separation consisting of a 6'/7' masonry fence along all structural elements that are on the property line and include the construction of said fire barrier on the construction documents.
END OF REVIEW
01/17/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T12CM07800
5975 E Speedway
Lotus Garden Photovoltaic System (100,800 W)

1. Cover Sheet indicates 2005 NEC to be used for review:
How does the termination of PV System conductors from the new CT Can to the existing 400 amp Main Service comply with 690.64,B.2. Is a 250 amp circuit breaker provided? If so, the sum of the ampere ratings of overcurrent devices supplying power to the bus bar in the 400 amp Main Service Panelboard could equal 650 amp ? Please clearify this ?
Sheet # 9 does not show a detail of how conductors terminate, please provide one.
2. Please provide a detail drawing showing the actual proposed installation of finished job including:

Existing 400 amp Main Service Panelboard
New CT Can
PV System AC Disconnect
PV Utility Meter
Inverter
the One Line diagram provides a flow of the interconnection but does not provide a picture of the actual install.

Ray T Majuta
Electrical Plan Review
PDSD, C of Tucson
1/18/2013
Ray.Majuta@tucsonaz.gov
01/17/2013 KEN BROUILLETTE FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/22/2013 GERARDO BONILLA APPROVAL SHELF Completed
01/22/2013 GERARDO BONILLA OUT TO CUSTOMER Completed
01/22/2013 GERARDO BONILLA REJECT SHELF Completed