01/29/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
01/29/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Needs Review
01/31/2013 SPOWELL1 WWM REVIEW Needs Review
01/31/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide the requested structural calculations; a separate permit for structural is not acceptable. [Original comment: The rooftop units are scheduled as being new; provide the installed weight of the units, show how they are to be installed, and provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference: Section 302.1, IMC 2006.]
2. The termination of the condensate drain as shown on sheet P2.0 is unacceptable; see Section 307.2.1, IMC 2012, as amended by the City of Tucson for acceptable termination points. [Original comment: Show the size, routing, and termination of the condensate drains. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006.]
01/31/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Include the vertical pipe when determining the developed pipe lengths. [Original comment: Provide a complete diagram of the natural gas distribution system showing the all of the loads, developed lengths, and the layout of the distribution piping on a plan view of the building. Reference: Section 106.3.1, IFGC 2012.]
2. Determine the correct pipe sizes per Section 402.3, IFGC 2012. [Original comment: Provide gas pipe sizing calculations demonstrating conformance to Section 402.1 and 402.3, IFGC 2012.]
3. Show the hub drain on the plumbing plan and the sanitary sewer riser. Reference: Sections 106.3.1 and 802.3, IPC 2012. [Original comment: Clarify the termination points for the T&P relief piping and for the drain for the pan under the water heater. The electric water heater detail does not appear to be coordinated with the plumbing plan with regard to the location of the water heater as compare to the location of the mop sink. In addition, an indirect waste receptor (e.g. a hub drain) shall not be installed in a restroom. Reference: Sections 106.3.1, 504.6, 504.7.2 and 802.3, IPC 2012.]
4. Provide a 4" cleanout for the 4" drain pipe. [Original comment: Provide cleanouts for all horizontal drains; the cleanouts shall be sized per Section 708.7, IPC 2012 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.3.1 and 708.5, IPC 2012.]
5. The new hub drain will require a trap primer. [Original comment: Provide protection of the trap seals for all floor drains subject to infrequent use. Reference: Section 1002.4, IPC 2012.]