Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07541
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/11/2013 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 01/11/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 01/11/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM07541 22 W Drachman 1. Provide the size of the overhead conductors in the riser, cannot be overloaded. 2. How was the total 113 amp load for the service obtained, and has new load been added to this ? 3. Size the conductors fron the wireway to the 200 amp disconnect. 4. Size the fuse in the 200 amp disconnect. 5. The conductors from the disconnect to panel A are only 100 amp ? 6. All kitchen receptacles per 2005 NEC 210.8.A.6 are requirwd to be GFI protected. 7. Tie Exit Lights in a circuit, indicate unswitched. 8. Change F5 to F6 type fixtures on plan. 9. Indicate on plan the voltage and phase type of service. Ray T Majuta PDSD, C of Tuc Elect Plan Review 1/11/2013 |
| 01/11/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | Verify size and location of the backflow preventer for the water service. |
| 01/11/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/11/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify which fixtures are new and which are existing. 2. Provide riser diagrams for the water and the waste & vent systems. 3. Show how the water temperature for the new lavatories will be limited to 110 degrees Fahrenheit. 4. Provide specifications for the grease intercepter and show how it will be installed. 5. Provide the pipe size, gas input (BTUH) and developed pipe lengths for each gas-fired appliance. |
| 01/11/2013 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 01/11/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 02/04/2013 | FRODRIG2 | WWM | REVIEW | Needs Review | |
| 02/04/2013 | FRODRIG2 | ENGINEERING | REVIEW | Needs Review | |
| 11/29/2012 | TERRY STEVENS | ZONING | REVIEW | Approved |