Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07526
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/05/2012 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 12/07/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1; WALL TYPE LEGEND: A NOTE FOR WALL F INDICATES TO SEE SHEET 4 FOR WALL BRACING. REVISE THE SHEET REFERENCE (NO SHEET 4). 2. SHEET A2; REFLECTED CEILING PLAN: A DETAIL 5/A4 IS CUT AT AN INTERIOR WALL. REVISE THE SHEET REFERENCE (NO SHEET A4). 3. GENERAL: IN ACCORDANCE WITH THE CITY OF TUCSON RECOMMENDATIONS AND THE IBC SECTION 3409.7, PROVIDE UPGRADES OF THE ACCESSIBLE ROUTE, RESTROOM GRAB BARS, OR OTHER ACCESSIBILITY IMPROVEMENTS (UP TO 20% OF THE PROJECT COST). NOTE THESE IMPROVEMENTS ON THE PLAN. 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 12/17/2012 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 12/17/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide material standards for all plumbing fixtures being provided by others. Reference: Section 303.4, IPC 2006. 2. Provide the listing information for the pedicure units. If the listing does not include integral backflow protection for the pull-out sprayer, revise the design to provide reduced pressure backflow preventers for the hot and cold water supplies. Reference: Sections 303.4 and 608.13, IPC 2006. 3. Provide structural calculations and details to verify that the proposed water heater will be safely supported by the building structure. Reference: Sections 106.3.1 and 301.2, IPC 2006. |
| 12/17/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 12/17/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the exhaust system to capture the contaminants and odors from the nail drying station. Reference: footnote I, Table 403.3, IMC 2006. |
| 12/20/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/08/2013 | CPIERCE1 | REJECT SHELF | Completed |