Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07485
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/27/2012 | TERRY STEVENS | ZONING | REVIEW | Approved | |
11/27/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
11/27/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/27/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/27/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/27/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The flow control device for a hydromechanical grease interceptor shall be installed in a location that is readily accessible and visible. Reference: Section 1014.2.1, UPC 2006. 2. Provide an indirect connection for the sanitizing compartment of the 3-compartment sink, with a direct waste connection for the wash and rinse sections only. Reference: Sections 304.0, 704.3, and 801.2.3, UPC 2006. 3. Modify trap arm lengths for the lavatories to conform to Table 10-1, UPC 2006. Reference: Section 1002.2, UPC 2006. 4. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 5. Provide a vacuum relief for a storage-type water heater located above any fixture outlets. Reference: Section 608.7, UPC 2006. |
11/27/2012 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
11/27/2012 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/27/2012 | RONALD BROWN | ADA | REVIEW | Passed | |
12/10/2012 | SPOWELL1 | WWM | REVIEW | Needs Review | |
12/10/2012 | SPOWELL1 | ENGINEERING | REVIEW | Needs Review |