Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07396
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/24/2013 | SPOWELL1 | WWM | REVIEW | Needs Review | |
11/20/2012 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
11/20/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
11/20/2012 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/20/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET P2; PLUMBING PLAN NOTE 2: THE NOTE INDICATES THE HOT WATER HEATER SUPPORT SHELF REQUIREMENTS WILL BE SHOWN ON THE ARCHITECTURAL PLANS. NO DETAIL WAS FOUND. PROVIDE. |
11/20/2012 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
11/21/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the mechanical design as required to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2006. 2. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. even when the lights are off in the restrooms). Reference: Section 403.2.1 (4), IMC 2006. |
11/21/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The existing shell building has a 3/4" water service, either the 1-1/4" service proposed on P2 needs to be revised or the water service must be changed. 2. Provide cleanouts sized no smaller than required by Section 707.11, UPC 2006 (e.g. provide a 4" cleanout for the 4" drain in the men's restroom). 3. Horizontal drain lines serving sinks require cleanouts. Reference: Section 707.4, UPC 2006. 4. Show how the water temperature for the lavatories is to be limited to 11 degrees Fahrenheit. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 5. Provide information to show how the proposed water heater is to be supported from the building structure (no details provided on the architectural drawings). Reference: Section 314.5, UPC 2006. |
11/21/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/21/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM07396 1. Main Disconnect requires a neutral per 250.24(C) 2.Mechanical Plans examiner requires ex-fans in restrooms to come on when air is supplied to restroom by unit not just when light is on. 3.The 2/0 copper feeders to the transformer should be procted at 175 amps per 240.6.(On one line diagram) 4.0Sheet E.2 shows the transformer in front of the panels, in the clearance area reqyuired by the panels. 5. Show location of the landlords Main Service. 6. Provide an existing load on the landlords service then add this space load for a new total, Ray T Majuta Elect Plan Review DPSD, C of Tucson 11/21/2012 Ray.majuta@tucsonaz.gov. |
11/26/2012 | CARL SCHULTZ | FIRE | REVIEW | Approved |