Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T12CM07167
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/21/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
11/27/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET 1; GENERAL NOTES: NOTE 9 INDICATES A SOILS ENGINEER SHALL INSPECT AND TEST THE SOIL PREPARATION. WAS A GEOTECHNICAL INVESTIGATION REPORT PREPARED FOR THIS PROJECT? IF SO, PROVIDE THAT REPORT FOR REVIEW. 2. SHEET SD1: PROVIDE MATERIAL STRENGTHS ON THE DRAWINGS FOR THE WELDING. 3. STRUCTURAL CALCULATIONS: WHERE WERE THE VALUES USED IN THE CALCULATIONS FOR SOIL BEARING AND LATERAL RESISTANCE OBTAINED FROM? CLARIFY. 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
12/05/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM07167 7570 E Speedway Photovoltaic System Installation 1. Per City of Tucson Commercial Plan Submittal Requirements, all text upper and lowercase to be minimun 3/32'', and to be clear and legible.The following sheets do not meet above requirements, E1.1, E1.3, E1.5, E1.7, E1.9, E1.11, E1.13, E1.15 and E1.16. 2. Provide manufactures specification sheets for the following seperately as well as what has be printed on the plans, spec's sheets for the inverters, panels and the combiner boxes. 3. Show on plans where the following are located: Main Services MPB 1 through MPB 7, Disconnects for ACDS 1-1 through ACDS 7-1 TEP Meters (PV) CT Compartments Transformers Disconnects ACDS 1-2 through ACDS 7-2 AC Panelboards Inverters/DC Combiner Boxes (locations are required per C of Tuc Submittal Reqmt's) 4. Provide on plans a detail showing how the tap into supply side on main services is to be installed showing following: a. compartment of Main Service to be entered, b. are bus sections pre drilled or to be drilled? c. type of terminations to be used on conductors d. room for conductors in compartment ? e. location of ACDS disconnects in relation to MPB's f. detail of how section 690.47 is to be accomplished and conductor size if taps for each service is same as for all only one detail required, if taps different, detail for each required. The concern for the supply side taps is due to the applicability of the MPB to receive the new conductors. once this is determined this Jurisdiction may require a 3rd party certification depending on how the MPB has to be arranged. 5. Detail how the transformers are to be grounded, show conductor size. Ray T Majuta Electrical Plan Review PDSD, C of Tuc 12/6/2012 Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/21/2012 | FERNE RODRIGUEZ | REJECT SHELF | Completed |