Permit Number: T12CM07074
Parcel: 105110700

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T12CM07074
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/14/2012 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. PREVIOUS COMMENT 4; SHEET A1.2; FLOOR PLAN: WALL 1 IS INDICATED FOR THE EAST WALL OF THE WATER HEATER SUPPORT. DETAIL 1 ON SHEET A6 INDICATES A THREADED ROD AND FASCIA SECTION. VERIFY HOW THE WATER HEATER IS SUPPORTED. IS WALL 1 A FULL HEIGHT WALL? VERIFY. IT IS NOT CLEAR ON THE DRAWINGS HOW THE WATER HEATER IS SUPPORTED.
11/14/2012 ROBERT SHERRY WATER REVIEW Approved
11/14/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Comment not resolved; draining to "a non-nusiance [sic] area" is not the same as draining to an area capable of absorbing the condensate flow without surface drainage. [Original comment: Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson.]
11/14/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Comment not resolved; see detail 2/P3. [Original comment: Revise the font size used on the drawings to a minimum of 3/32-inch (all upper case). Reference: Section 106.1.1, IBC 2006.]
2. Comment not resolved; no cleanouts are shown for the water closets. [Original comment: Verify that upper terminal cleanouts have been provided for the water closets. Reference: Section 707.4, UPC 2006.]
3. Comment not addressed; the plumbing floor plan for waste and vent piping shows 4" drains with no 4" cleanouts. (Note that the building drain running through the break room is dimensioned as both 2" and 4" and the building drain leaving the restroom is shown as 4" on the plumbing floor plan but it is shown as 3" on the sanitary riser diagram.) [Original comment: Provide cleanouts sized per Section 707.11, UPC 2006.]
4. Coordinate the location and layout of the existing building drain as shown on sheet P1 with the building drain as shown on the shell drawings. [Original comment: Show the location of the existing building drain to which the new drain piping is to be connected. Reference: Section 103.2.3, UPC 2006.]
5. Coordinate the location and layout of the existing 2" water supply to the building as shown on sheet P2 with the water supply as shown on the shell drawings.
11/20/2012 FRODRIG2 ELECTRICAL-COMMERCIAL REVIEW Denied T12CM07074
1. Question #1 from last response is asking where the existing 2000 amp Main Distribution Switchboard ?Show location on one of the electrical sheets,required by Submittal Requirements.
2. Question #2 asks what is the existing load on the existing 2000amp Switchboard then add the new load this space for
a new total ? Also required by Submittal Requirements.

Ray T Majuta
Electrical Plan Review
PDSD, C of Tuc
11/14/2012