Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07000
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2012 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
11/13/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide a Site Plan. 2. Please provide a certification of the special inspectors required for this project. 3. At details 17and 22, Sheet A4.1, please delete the requirements for door mounted signage and follow the requirements as per ICC A 117.1, section 703. END OF REVIEW |
11/20/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/26/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/26/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 3/32-inch. Reference: Section 106.1.1, IBC 2006. 2. Provide a design for the mounting shelf for the water heater and its connection to the building structure along with structural calculations to show that the water heater is safely supported. Reference: Sections 106.3.1 and 301.2, IPC 2006. 3. Provide an additional cleanout for each 40-foot section of drains having a change of direction greater than 45 degrees (see the floor sink located near H.5-2.5; the cleanout is located about 39 feet and three 90 degree changes of direction from the drain for the floor sink). Reference: Section 708.3.3, IPC 2006. 4. Coordinate the waste and vent plan (P1.1) and waste and vent schematic "D": the trench drain for the produce cooler appears to have been omitted from the waste and vent schematic. Reference: Section 106.3.1, IPC 2006. 5. Clarify the proposed use and installation of the 3-compartment sink in the produce prep area. Reference: Sections 106.3.1, 802.1, 802.2, and 1002.1, IPC 2006. |
11/26/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. whenever the HVAC system is supplying air to the restrooms during occupied hours, all of the supply air shall be exhausted). Reference: Section 403.2.1 (4), IMC 2006. |
12/10/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/13/2012 | CPIERCE1 | REJECT SHELF | Completed |