Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM06869
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/01/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM06869 603 N Wilmot TI Medical Office 1. Sheet E2.1, circuit 1LE- 33,35 HVAC power plan show feeding EX-fan #9 which is 208 volt single phase, the panel schedule shows a 120 volt Projector circuit on 33, and a dedicated receptacle on 35, Sheet E2.0 on the power plan shows same as panel schedule. 2. The total va loads fpr Panel 1HA are added incorrectly for phases A<B and C. 3. Panel 1LE, the correct total va for phase C is 13,160 va, divided by 120volts = 109 amps. The panel is a 100 amp bus. Ray T Majuta Elect Pln Review PDSD, C of Tuc 11/1/12 Ray.Majuta@tucsonaz.gov |
11/05/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A2.0 1. As per ICC A117.1, Section 603.2.3, Door Swing for Toilet Rooms, Exception 2, the door may swing into the clearance of any fixture as long as it is an individual use toilet room and a 30 x 48 clearance space can fit in the room outside of the swing of the door. a. Please show this condition for each sized toilet room. If this condition can not be accommodated, please redesign the toilet room to comply with code. 2. Please indicate that the two required exit doors are existing and meet all code exit requirements as to size and panic hardware requirements. 3. Please provide drinking fountains as per the 2006 IBC, Section 29, 1109.5 and ICC A117.1, section 602.4. END OF REVIEW |
11/06/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1: ARIZONA ONCOLOGY EAST CONSOLIDATION - ADDED 104FU'S 2: NEED TO CLARIFY/SHOW SIZES & LOCATIONS OF ALL WATER METERS FOR SEWER CONNECTION FEE CALCULATION/EVALUATION 3: NEED ADDRESSING REVIEW - (SUITE NO. 150 INDICATED ON PLANS) |
11/08/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Verify the basis for the design of the gas piping system. Based on Table 12-8, UPC 2006, a 3" carbon steel pipe is capable of passing 1620 CFH with a 0.5" WC drop for only 350 feet. Earlier editions of the UPC (e.g. 1988) show basically the same data. It may be that the earlier design incorrectly assumed a heating value of 1100 BTU per cubic foot of natural gas which would have resulted in 1474 CFH. |
11/09/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/09/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide the manufacturer's listing information along with the installed weight for the fan-filter units. Reference: Sections 301.4 and 302.1, IMC 2006. 2. Provide information on the types of chemicals and the quantities of chemicals used in the fume hood. Reference: Section 510.5, IMC 2006. 3. Clarify the path of the fume hood exhaust duct from the chase to the roof. Reference: Sections 510.5.7, 510.6.2, and 602.1, IMC 2006. 4. Does the second floor have a return air plenum? Reference: Sections, 601.4, and 602.2.1, IMC 2006. |
11/13/2012 | MARTIN BROWN | FIRE | REVIEW | Denied | Please define the use of the fume hood in room 184 and the type of vapors emitted. Detail 2 on sheet P2.1 indicates a gas valve in hood. Fire sprinklers in hood and ductwork 10" in diameter or larger likely required. Add note to plans to verify installation or explain why they are not needed. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/21/2012 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
11/21/2012 | CINDY AGUILAR | REJECT SHELF | Completed |