Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM06722
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/22/2012 | TERRY STEVENS | ZONING | REVIEW | Approved | |
| 10/22/2012 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 10/22/2012 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 10/22/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET G0.0; BUILDING CODES: THE ACCESSIBILITY CODE IS LISTED AS THE ADA. REVISE TO THE 2006 IBC AND ICC/ANSI A117.1-2003. 2. SHEET D1.0 (KEYNOTES); SHEET A2.0 (KEYNOTES): KEYNOTE 1 ON D1.0 INDICATES REMOVING A 3'-0" DOOR IN THE EXISTING WALL. KEYNOTE 14 ON A2.0 INDICATES TO INSTALL A NEW STEEL CMU LINTEL, EACH FACE, AT THIS OPENING (NOW A 4'-0" NEW DOOR). PROVIDE A STRUCTURAL CALCULATION AND A STRUCTURAL DETAIL (ON THE FULL SIZE DRAWINGS) FOR THAT NEW LINTEL. 3. SHEET A2.4; PLAN: HOW IS THIS A FIRE PROTECTION PLAN? VERIFY. 4. SHEET A2.5; PLAN: HOW DO THE WALL FINISHES IN THE RESTROOMS MEET THE 2006 IBC SECTION 1210.2? VERIFY. 5. SHEET A8.0; DETAIL 15: PROVIDE A DETAIL AT THE EXISTING ROOF FOR STEEL OR WOOD JOISTS (ACCORDING TO THE EXISTING SHELL DRAWINGS). INCLUDE BRACING BETWEEN THE EXISTING FRAMING AND THE CONNECTIONS. 6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 10/22/2012 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 10/23/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. 2. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. the exhaust works during occupied hours even when the lights are off). Reference: Section 403.2.1 (4), IMC 2006. |
| 10/23/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the plumbing code to be used for this activity. The project summary refers to both the 2006 UPC and the 2006 IPC. This review has been made using the 2006 IPC. 2. Provide a design for the mounting shelf for the water heater; no information was found in the architectural sheets. Reference: Sections 106.3.1 and 301.2, IPC 2006. 3. Verify that installation of the vacuum relief valve for the water heater on the hot water pipe complies with the manufacturer's installation instructions. Reference: Sections 501.0 and 504.2, IPC 2006. 4. Provide water pressure and water pipe sizing calculations. Reference: Section 604.1, IPC 2006. 5. A hot water recirculation pump is scheduled on sheet P-2; is it part of this activity? |
| 10/23/2012 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a reference site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 106.3.1, IPC 2006. |
| 10/23/2012 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
| 10/24/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. Provide total service load and show this addition included,indicate how total load obtained. 2. Provide 2006 IECC Budget Lighting Calculations, Com-Check ok. 3. Show location of service and travel of feed to panel A. 4. Show fault current available at panels A and B. Ray T Majuta Elect Pln CK PDSD, C of Tuc 10/24/2012 Ray.Majuta@tucsonaz.gov |
| 11/13/2012 | FRODRIG2 | WWM | REVIEW | Needs Review |