Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T12CM06483
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/06/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET C1 1. Please clearly identify and show the patio balcony and exiting. SHEET A0 2. Add A3 to the occupancy type: assembly at new roof top patio 3. Please revise your 1107 section unit type requirements to that as required by the 2006 IBC sections 11078.6.2.1.1 and 1107.6.2.1.2 and the 2003 ICC A117.1, Sections 1003 and 1004. Revise the specified dwelling types accordingly. SHEET NUMBERS A1, A2, A3, A4 AND A5 4. Revise the dwelling unit layouts as required to meet the Type "A" and Type "B" units as required per comment 1. 5. Somewhere on these 3 sets of floor plans, all fire rated partitions need to be identified and referenced to a partition schedule with testing laboratory rated assembly identifications. 6. Please more clearly identify the roof top patio and exiting. SHEET A1 7. As per the 2006 IBC, Section 1018.4, Exception 2, dead end corridors may be not more than 50' when sprinkler as per section 903.3.2.2. The corridor to unit three is in excess of 50'. Please reconcile and resubmit. SHEET A8 8. At the roof patio deck: a. Provide architectural construction sections and details. b. Spiral stairs are not code compliant. Provide compliant exit, egress stairs. c. Provide occupant load and square footage. Will need two exits with 1/5 assembly standing occupancy calculations. d. Show deck and compliant exits on all floor plans and site plan. SHEET S1 9. Provide certification of special inspectors. CALCULATIONS 10. Please provide foundation and framing key plans. 11. Please provide structural calculations for any and all new HVAC roof mounted equipment. END OF REVIEW |
02/06/2013 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/14/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide the mechanical energy code compliance certification for the installation of the new mechanical equipment. Reference: Section C303.1, International Energy Conservation Code 2012. 2. Provide the installed weight of the rooftop equipment and the fan coil units. Reference: Section 302.1, IMC 2012. 3. Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2012. 4. Revise the size of the clothes dryer exhaust duct to comply with the requirements of Sections 304.1 and 504.6.1, IMC 2012. 5. Provide calculations to show how natural ventilation has been provided. Reference: Section 402.1, IMC 2012. 6. Ventilation for bathrooms in private dwellings requires a minimum of 20 CFM (continuous operation) or 50 CFM (intermittent operation) of mechanical exhaust per room with no recirculation of air. Reference: Table 403.3, IMC 2012. |
02/14/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/14/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The water demand and distribution calculations appear to have utilized the fixture units from appendix E of the 2006 IPC. Include the water fixture units for the dishwasher in the calculations. Reference: Sections 604.1 and 604.3, IPC 2012. 2. Verify that the calculated allowable friction for the water distribution system (5.4 PSI per 100 feet), will not be exceeded when using ½" PEX tubing for fixtures requiring 2.0 GPM or more (e.g. dishwashers, kitchen sinks, lavatories, water closets, and showers). Reference: Section 604.3, IPC 2012. 3. Show the drainage fittings installed correctly and in a manner consistent with the Code and the manufacturer's instructions (see P5 in soil & vent riser 4/P4). Reference: Section 303.2, IPC 2012. 4. Provide information to show how the proposed water heater, WH-18 is to be connected to the building structure. Reference: Sections 301.2 and 303.2, IPC 2012. 5. Clarify the installation of WH-17; per keynote #12 on sheet P2, it is floor-mounted inside of an ADA-accessible shower. Reference: Section 303.2, IPC 2012. |
02/22/2013 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED CHECKLIST- NEED TO REVIEW NEED TYPE III NEED WATER METER NUMBER & VERIFICATION OR USER FEES PAID |
02/22/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM06483 222 S Cherry Av Roja Cruz Apartments 1. The installation will be per the 2005 NEC requirements due to the permit being started at our department in December 2012, thus the T12CM06483 number. The IRC would only cover one and two familly dwellings on thier own. 2. The services are 3 phase, all apartment and HP panels are single phase, the service phases are to be balanced within 15% ( per City of Tucson Submittal Requirements). Show which single phase groups are to go to which panels and how the service feeders will be balanced.( AB,BC and CA phases). 3. Per Fault current analysis, if contractor is to be responsible for determining AIC values in panels according to distances, please insert in bold lettering, the small lettering in FC analysis box too small. Ray T Majuta PDSD, City of Tucson Electrical Review 2/22/2013 Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/28/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |