| 10/04/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM05941 4801 E 29TH st 1. Sheet E-4,customer provides the service riser and conductors, show conductor size , number and type, also conduit size and type,(conductor must be Sun Light Resistant). 2. Cru units show two loads in Mechanical Sheets, only one breaker provided in panel, does evaporator feed of condensor circuit ? 3. WH-2 in panel schedule is feeding off B-3, 5, the WH shows a load of 14.4 amps,the circuit breaker is a 50 amp ? 4. The power plan shows RTU-3 twice. 5. Mechanical Sheet -2 shows RTU-1,2,3,4 units as 208v single phase,panel schedules show 3 phase ? 6. How are Wh's provided disconnects as required by 2005 NEC 422.31 ? Ray T Majuta Elect Pln Review PDSD, C of Tuc 10/05/2012 Ray.Majuta@tucsonaz.gov |
| 10/04/2012 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 106.3.1, IPC 2006. |
| 10/04/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008). 2. Given the temperature range of the water supply in Tucson (as high as 90.3 degrees Fahrenheit), specify how the instantaneous water heater that delivers a 41degree Fahrenheit rise to the lavatory faucet can guarantee a maximum delivery temperature of 110 degrees Fahrenheit. Note that the specified model for WH-2, unlike WH-1, is not capable of limiting the water temperature to 110 degrees Fahrenheit. In addition, the minimum flow rate required to turn on the water heater is also the maximum flow rate for a lavatory. Reference: Section 416.5, IPC 2006 and Section 504.3, IECC 2006. See also, ARS Title 45, Chapter 1, Article 12 (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). 3. Provide a waste and vent isometric to show the installation of SK-1 and EWC-1. Provide a description of SK-1. Reference: Section 106.3.1, IPC 2006. 4. Provide a description of keynotes 7 and 8; they are shown on the plumbing plan but not described. Reference: Section 106.3.1, IPC 2006. 5. Coordinate the electrical requirements for WH-2 with the panel schedule. WH-2 draws only 14.4 Amps but panel B shows a 50-Amp breaker for it. Neither WH-1 nor WH-2 is 3-phase unit. |
| 10/04/2012 | MARTIN BROWN | FIRE | REVIEW | Denied | 1. Please provide rated partitions for all exit corridors. a. Show all rated partitions required on the Egress Plan sheet A2.1. b. All doors located in a rated partition must also be rated. Please schedule all rated doors as such on the door schedule. |
| 10/12/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 1; SHOW RATED PARTITIONS FOR THE EXIT CORRIDORS: THE DETAIL B/A4-0 INDICATING A TYPICAL INTERIOR WALL DOES NOT MEET THE CRITERIA OF THE 2006 IBC, SECTION 708, FOR A FIRE PARTITION. PER 708.4, THE PARTITION ASSEMBLY SHALL EXTEND FROM THE FLOOR TO THE UNDERSIDE OF THE ROOF SHEATHING. REVISE DETAIL. 2. PREVIOUS COMMENT 1b: IT DOES NOT APPEAR FROM THE DOOR SCHEDULE (SHEET A6-0) THAT ALL CORRIDOR DOORS MEET THE CRITERIA OF THE 2006 IBC, TABLE 715.4. VERIFY. 3. PREVIOUS COMMENT 2: NO DETAIL WAS ADDED ON THE DRAWINGS TO INDICATE REQUIREMENTS OF THE 2006 IBC, SECTION 1607.13, ARE MET. PROVIDE THE DETAIL ON THE DRAWINGS, INCLUDING THE BRACING MEMBER SIZE AND SPACING, CONNECTION TO THE PARTITION WALL, AND CONNECTION TO THE EXISTING STRUCTURE ABOVE. 4. PREVIOUS COMMENT 3: A LARGE SCALE DETAIL ON THE NEW EXTERIOR RAMP AND LANDING WERE NOT ADDED AS REQUESTED. PROVIDE ON THE DRAWINGS. 5. PREVIOUS COMMENT 4: THE MINIMUM LETTERING HEIGHT OF 3/32" (FOR UPPER AND LOWER CASE) WAS NOT PROVIDED. SEE SHEETS A0-0 (GENERAL NOTES), A1-0 (KEYNOTE REFERENCES ON THE PLAN), A2-0 (KEYNOTE REFERENCES ON THE PLAN), A2-1 (KEYNOTE REFERENCES ON THE PLAN), A3-0 (KEYNOTE REFERENCES ON THE PLAN), AND SHEETS SP-01 THROUGH SP-04 (SPECIFICATIONS). 6. PREVIOUS COMMENT 5: A NEW SITE PLAN (DUE TO CHANGING ACCESSIBLE PARKING SPACES, ADDING A GENERATOR, OR ADDING A NEW LANDING AND RAMP) WAS NOT ADDED TO THE DRAWINGS AS REQUESTED. PROVIDE. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 10/18/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 10/23/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |