Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM05941
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/24/2012 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 09/24/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 09/24/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 09/24/2012 | ROBERT SHERRY | WATER | REVIEW | Needs Review | |
| 09/24/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide rated partitions for all exit corridors. a. Show all rated partitions required on the Egress Plan sheet A2.1. b. All doors located in a rated partition must also be rated. Please schedule all rated doors as such on the door schudule. 2. Show all partitions braced to structure above, min lateral load requirements of 5 psi. 3. Provide large scale detail of the new exterior ramp and landing. a. Show handrails and provide handrail elevation. 4. Minimum COT lettering size is 3/32" actual, upper and lower case. Revise all non-compliant lettering and resubmit. 5. A new site plan will have to be submitted for Zoning reviev because of changes in site plan: a. Changing accessible parking spaces b. Adding a generator c. Adding a new landing and ramp. d. Any other changes not noted Please contact Steve Shields with Zoning at 837- 4956. END OF REVIEW |
| 09/24/2012 | FRODRIG2 | WWM | REVIEW | Needs Review | |
| 09/24/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 09/24/2012 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
| 09/24/2012 | MARTIN BROWN | FIRE | REVIEW | Denied | 1. Please provide rated partitions for all exit corridors. a. Show all rated partitions required on the Egress Plan sheet A2.1. b. All doors located in a rated partition must also be rated. Please schedule all rated doors as such on the door schedule. |
| 09/24/2012 | RONALD BROWN | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 09/24/2012 | RONALD BROWN | ADA | REVIEW | Passed |