Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T12CM05621
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/19/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
02/21/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Install the vacuum relief valve on the cold water inlet to the water heater, per the manufacturer's installation instructions. Reference: Section 303.2, IPC 2006. [Second comment: Comment not resolved; a T&P relief valve is not the same as a vacuum relief valve (see Watts model N360 for an example of a vacuum relief valve).] [Original comment: Provide an approved anti-siphon device (e.g. vacuum relief valve) for a storage-type water heater located above any fixture outlets. Reference: Section 504.1, IPC 2006.] |
02/22/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | The building components shown in the envelope energy calculations are not coordinated with the architectural drawings (e.g. the calculations call out R-38 cavity insulation plus R-30 continuous insulation in the roof but on sheet A7, the roof has R-38 cavity insulation and no continuous insulation). Also, the basis of the calculations on sheet M9.11 is unclear; the floor area shows 8725 square feet but the roof area is shown as only 1963 square feet. The energy code allows you to demonstrate compliance based on either the addition alone or on the entire building including the addition. Conversely, the deleted calculations on sheet G1 appear to be based on just the addition (but with only one door). [Second comment: Comment not resolved; coordinate the building components used in the calculations with the proposed building shown on the architectural plans.] [Original comment: Clarify the envelope energy calculations for this addition; two very different calculations have been provided, one on G1 and another on M9.11.] |