Permit Number: T12CM05046
Parcel: 11310109B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T12CM05046
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/15/2012 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Dunkin Donuts - 2553 N. Campbell Avenue
T12CM05046
Building Plan (2nd Review)

TRANSMITTAL DATE: November 15, 2012

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning can not approve the building plan until a development package has been approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
11/19/2012 ROBERT SHERRY WATER REVIEW Approved
11/19/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Show the size of the common condensate drain. [Original comment: Show the size, routing, and termination of the condensate drains. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson.]
11/19/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The specified hydromechanical grease interceptor (Zurn GT-2700-50) does not have an integral flow control device. See the Zurn engineering bulletin for an explanation: http://content.zurn.com/web_documents/pdfs/miscellaneous/SD10.pdf [Original comment: Detail 9/P-3 shows the installation of a flow control device for the 3-compartment sink but nothing indicates the installation of flow control devices for the other three fixtures that are connected to the hydromechanical grease interceptor. Show how the total flow to the hydromechanical grease interceptor is to be controlled or provide a hydromechanical grease interceptor with an integral flow control device. Reference: Sections 1003.2 and 1003.3.4.2, IPC 2006.]
2. Show the size of the roof drain and drain leader noted on sheet A-2.1 (Keynote #3) and shown in detail 1/A-10.
11/27/2012 GERRY KOZIOL WWM REVIEW Denied 1: DUNKIN DONUTS
2: CONNECTION TO EXISTING ON SITE PRIVATE SEWER PER DRAWINGS AND PERMIT #ZP-8499 DATED 05/30/73
3: CONNECTING TO EXSITING 1" WATER METER PER DRAWINGS- NEED WATER SUPPLIER VERIFICATION OF OF EXISTING WATER METER
4: NEED WASTEWATER/IWC/REVIEW OF 50GPM/100# INTERIOR GREASE TRAP- RUSTY 724-6200 - 2024 W EL CAMINO DEL CERRO

Final Status

Task End Date Reviewer's Name Type of Review Description
12/18/2012 SHANAE POWELL OUT TO CUSTOMER Completed
12/18/2012 CPIERCE1 REJECT SHELF Completed