Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T12CM04731
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/02/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
10/02/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 11: THE ROOF PLAN GENERAL NOTE 4 ON SHEET A4.1 STILL REFERENCES SHEET A4.1 (BELOW) FOR ROOF DETAILS. REVISE. 2. PREVIOUS COMMENT 12: THE NOTE ON ELEVATIONS 2, 3, 4, AND 5 ON SHEET A5.1 INDICATING THE EXISTING ADMINISTRATION ELEVATION IS CONTINUED ON SHEET A5.6 HAS NOT BEEN REVISED PER YOUR RESPONSE. 3. PREVIOUS COMMENT 17: PROVIDE A NOTE ON THE DRAWINGS (SHEETS S1.1, S1.2, AND S1.3) THAT INDICATES ALL KEYNOTES LISTED DO NOT OCCUR ON ALL SHEETS. 4. PREVIOUS COMMENT 23: PROVIDE A NOTE ON THE DRAWINGS (SHEETS S3.1, S3.2, AND S3.3) THAT INDICATES ALL KEYNOTES LISTED DO NOT OCCUR ON ALL SHEETS. 5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
10/11/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
10/11/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved; provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006. [Original comment: This building appears to be receiving all new water service from a new 3" water meter and backflow preventer and is not dependent upon any existing, unknown piping. Designing a water distribution system solely based upon water velocity can result in inadequate water pressure or flow rates at the fixtures. Provide water pressure and water pipe sizing calculations. Reference: Sections 604.1 and 604.3, IPC 2006.] 2. Comment not resolved; "flat venting" is allowed only when required due to structural problems. Note that the term "horizontal pipe" refers to a pipe which makes an angle of less than 45 degrees with the horizontal (Section 210.0, UPC 2006). Each vent pipe shall rise vertically to a minimum of 6" above the flood-level rim of the fixture it serves before offsetting horizontally. Reference: Section 905.3, UPC 2006. [Original comment: Verify that all of the vents rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2006.] 3. Comment not addressed by the architect. Provide roof drainage calculations and plans; include the effects of all side walls draining onto the roof and any contributing roof areas. All roof areas shall be drained by roof drains, scuppers, or gutters. Provide overflow protection for the roof with the parapet. Reference: Sections 1101.11.1, 1101.11.2, and 1106.0, UPC 2006. [Original comment: Provide drainage calculations and plans for the new roof sections including sizing information for the roof scupper and downspout. Provide overflow protection for the roof. Reference: Sections 1101, 1106 and 1107, IPC 2006.] |
10/16/2012 | CPIERCE1 | WWM | REVIEW | Needs Review |