Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Permit Number - T12CM04484
Review Name: RESIDENTIAL - BLDG/ZONING-WALKTHRU
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/06/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD Zoning Review Transmittal TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: T12CM04484 4818 E. 12th Street TRANSMITTAL DATE: August 6, 2012 Proposed Project: Addition of storage room COMMENTS: Site Plan OK D.D.O. required for: Perimeter yard setback from the proposed storage addition to the front street and east perimeter yard property line & attached box trailer to the west perimeter yard property line. Per LUC Section 3.2.6.4, R-1 Zone, Development Designator "G", Perimeter Yard Indicator "AA" the required perimeter yard setback is 6.0' or 2/3 the height of the exterior wall. 1. Based on an exterior wall height of less than 7.50" the required perimeter yard setback from the proposed storage room addition to the east property line is 6.0', proposed setback is 0.05'. 2. Based on an exterior wall height of less than 9.0" the required perimeter yard setback from the proposed attached box trailer to the west property line is 6.0', proposed setback is 0.25'. Per LUC Section 3.2.6.5.A Within established areas, the front street perimeter yard is twenty (20) feet or one and one-half (1 1/2) the height of the proposed wall (H), measured from the street property line, whichever is greater, up to a maximum of ninety (90) feet. 3. Based on an exterior wall height of less than 6.0" the required front street perimeter yard setback from the proposed steel cover to the front street property line is 20.0', proposed setback is 18.0'. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov (520) 837-4956 |
| 08/06/2012 | SSHIELD1 | NPPO | REVIEW | Passed | |
| 11/05/2012 | CAGUILA1 | ENGINEERING | REVIEW | Needs Review | |
| 11/05/2012 | CAGUILA1 | BUILDING-RESIDENTIAL | REVIEW | Needs Review |