Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T12CM04345
Parcel: 134031450

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T12CM04345
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/04/2012 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. PREVIOUS COMMENT 25: SHEET S1.7; WOOD TRUSS SCHEDULE: THERE ARE NO TRUSS GIRDER DESIGNATIONS IN THE WOOD TRUSS SCHEDULE. THE ROOF AND FLOOR FRAMING PLANS ON SHEETS S2.2, S2.3, AND S2.4 INDICATE TRUSS GIRDERS. PROVIDE THOSE IN THE SCHEDULE.
2. GENERAL: COMMENTS FOR THE RECREATION BUILDING AND MAINTENANCE BUILDING ARE POSTED UNDER THEIR RESPECTIVE ACTIVITY NUMBERS (T12CM04333 AND T12CM04657).
09/12/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Comment not addressed for this building. Provide energy code compliance calculations for the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
2. Comment not addressed for this building. Provide energy code compliance calculations for the mechanical systems. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
09/12/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Comment not resolved; the civil plans still show a 4" building sewer. [Original comment: Clarify the note on the first floor plumbing plan regarding the "alternate location" for the location of the connection of the building drain and the building sewer. How is the location of the connection of the building drain and the building sewer changing the size of the building sewer from 6" to 4" on the plumbing floor plan but not on the riser drawing? Note that the civil plans show all of the apartment buildings having 4" building sewers. ]
2. Provide sheet P2.3.
09/13/2012 GERRY KOZIOL WWM REVIEW Denied 1. THE PLACE A PRESIDIO TRAIL - S12-017/DP12-0061 - CLUBHOUSE (18FU'S) - T12CM04333 - 13-APARTMENT BUILDINGS (3614FU'S) T12CM04334 THRU T12CM04345 & T12CM04347 - MAINTENANCE BUILDING (11FU'S) T12CM04657
2. NEED TO BUILD PUBLIC SEWER/NEED PUBLIC SEWER APPROVAL AND PUBLIC SEWER CONSTRUCTION PERMIT AND HOLD HARMLESS LETTER-NEED TO PERMIT ON-SITE PRIVATE SEWER #PT12S00910 - NEED DEQ REVIEW & APPROVAL TO CONSTRUCT ON-SITE PRIVATE SEWER - NEED COPY OF ON-SITE PRIVATE SEWER FOR BASE MAP UPDATE
3. NEED TO INDICATE SIZE OF WATER METERS ON "WATER SERVICES" TO SERVE BUILDINGS ON PUBLIC WATER PLANS - NOTE: THIRTEEN 2" WATER SERVICES" FOR 13-APARTMENT BUILDINGS AND ONE 1 1/2 "WATER SERVICE" FOR CLUBHOUSE AND ONE 1" " WATER SERVICE" FOR MAINTENANCE BUILDING FOR SEWER CONNECTION FEE CALCULATION
09/13/2012 TERRY STEVENS ZONING REVIEW Denied Zoning cannot approve until buliding and the development plan has been approved.