Permit Number: T12CM03959
Parcel: 140420740

Address:
7150 S TUCSON BL

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T12CM03959
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/11/2012 MARTIN BROWN FIRE REVIEW Denied Door schedule (sheet A10.0) for door 300A states panic hardware to be removed. International Fire Code (section 1008.1.9) indicates all doors from an A occupancy to have panic. Explain removal. Additionally, it appears there is a new electrical room and door (110A). Verify no panic hardware required. Refer to IFC section 1008.1.9 regarding electrical rooms.
07/20/2012 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. A structural review could not be conducted because no structural calculations were provided for the structural changes in this project. Please provide structural calculations for all structural additions and changes
2. Please provide structural calculations for all new roof top mounted HVAC equipment.
SHEET A2.1
3. For all exit doors and gates, (119A, 120A, 110A, 114A, 100A, and 102A) please provide panic hardware as required by the 2006 IBC, Section 1008.1.9.
At detail numbers 1/A2.2, 2/A8.0 and 5/A8.0, please provide spot elevations at the top on bottom landing to show the finished grade elevation differentiations.

END OF REVIEW
07/27/2012 ROBERT SHERRY WATER REVIEW Approved
07/27/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
07/27/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
08/01/2012 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T12CM03959
7250 S Tucson Bl
TIA CDC and EOC Remodel

1. Sheet E-10.0, indicate on this sheet --transformers over 112.5KVA Dry type to be installed in a room of fire resistant construction,per 2005 NEC,450.21(B).
2. Sheet E11.1, new panels and their breakers do not provide level of fault currents to be rated for. Please provide a fault current analysis for new equipment per 2005 NEC
110.9 and 110.10.
3. Sheet E11.1, finish the total loads in VA and current
on Panel CDCPB.
4. Please clearify your statement on Sheet E12.0 , "Bldg is Underutilized at 125 KW times 2 = 250 KW as basis of existing load" and that the Net Load at 791 amps at 480 V
in regards to the 760 amp feeder ?

Ray T Majuta
Elect Pln Review
PDSD, City of Tucson
8/02/2012
Ray.Majuta@tucsonaz.gov
08/08/2012 GERRY KOZIOL WWM REVIEW Approved