Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T12CM03655
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/28/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
07/02/2012 | DAVID RIVERA | ZONING | REVIEW | Approved | |
07/10/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide the following for the Gate House, the Maintenance Building and all structures, arbors, mail box structures, sign walls, cabanas, dumpster enclosures, gates, fencing over 6'-0" tall and etc. a. Completed two part Certification form for special inspectors. b. Letter head stationary deferred submittal summary to be sent to the building official, Mr. Ron Boose. c. Please provide complete structural calculations for all foundations, roof framing and shear walls for all structures shown on the drawings and listed above. 2. Please provide structural calculations and details for all 20' and higher light pole foundations END OF REVIEW |
07/13/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the size of the water service and the location of the water service entrance to the maintenance building with the civil drawings. Reference: Section 106.3.1, IPC 2006. 2. Provide fixture descriptions (i.e. material standards) for all plumbing fixtures in the maintenance building. Reference: Section 402, IPC 2006. 3. Provide a design for the sump pit in the maintenance building. Reference: Sections 402.2 and 423.2, IPC 2006. 4. Provide a cleanout for the horizontal building drain in the maintenance building. Reference: Section 708.3.1, IPC 2006. 5. Provide a design for the building sewer for the maintenance building; the civil drawings show no connection to the private sewer collection system. Reference: 701.2, IPC 2006. 6. Provide an accessible water service shut off valve for the maintenance building. Reference: Section 606.1 IPC 2006. 7. The plumbing drawing for the maintenance building shows a reduced pressure backflow prevention assembly installed within the building. Provide the size of the reduced pressure backflow prevention assembly. If there are any uses for the water other than the future pool equipment (e.g. hose bibbs), show the piping on the drawing. Reference: Section 106.3.1, IPC 2006. 8. The plumbing drawing for the maintenance building calls trap primers for the two floor drains; specify the trap primers and clarify how these are to work. Reference: Sections 106.3.1 and 1002.4, IPC 2006. 9. The drawing index on sheet G001 for the gate house includes plumbing sheet P102; is there any plumbing for the gate house? Reference: Section 106.3.1, IPC 2006. 10. No plumbing is shown on the amenity plans; will there be any yard water piping (for hose bibbs or drinking fountains etc.) installed as part of this activity? Reference: Section 106.3.1, IPC 2006. |
07/13/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations for the gate house envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient additional detail on the drawings to evaluate the energy compliance of the building envelope. The information shall include, as a minimum, construction of the fenestration components. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Provide the types and quantities of chemicals that will be stored, used, or dispensed in the three rooms of the maintenance building. Reference: Table 307.1(1), IBC 2006. |
07/13/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
07/20/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM03655 1000 E 22nd ST Retreat Maint Bld, Gate House All reference to 2005 NEC Maint Bldg 1.Provide a fault current analysis for service on through to panel and show breakers or fuse rating. This is required at plan check rather that leaving up to installer to provide. 2. Provide 2006 IECC Lighting Budget Compliance report. 3. Provide compliance calculation with City of Tucson Outdoor Lighting Code,2012. 4. Provide fixture cut sheets. All items abovr required by City of Tucson Submittal Requirements. 5. Indicate on panel schedule breakers which are for future use. Gate house 1. Indicate circuits which will be for futute use. 2. All out door lighting to be included on City of Tucson OutDoor Lighting Compliance Report. Ray T Majuta Elect Plan Review PDSD, City of Tucson 7/20/2012 Ray.Majuta@tucsonaz.gov |
07/26/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/21/2012 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |