Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM03541
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/15/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/15/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Section 403.3, IMC 2006, as amended by the City of Tucson allows the use of the ASHRAE 62-1-2004 ventilation calculation procedure provided that the default occupant densities and combined outdoor air rates are used. If you wish to use the exception to Section 403.3, IMC 2006 which allows the use of statistical data to reduce the number of people used to determine the required ventilation rates, submit an appeal to the building official per Section 105.2, IMC 2006, Alternative materials, methods, equipment and appliances. 2. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted when the building is occupied. Reference: Section 403.2.1 (4), IMC 2006. |
06/15/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | EXHAUST FANS IN RESTROOMS ARE SHOWN SWITCHED WITH LIGHTS, PLEASE PROVIDE SEQUENCE OF OPERATION TO COMPLY WITH IMC SECTION 403. |
06/15/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/15/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A8a; DETAIL A: PROVIDE CALCULATIONS FOR THE PRE-CAST CONCRETE LINTEL OVER THE NEW OPENING. 2. SHEET A8a; SECTION 1: NOTE 25 REFERENCES DETAILS A/A8b AND B/A8b. REVISE NOTE. 3. SHEET A8a; SECTION 1: PROVIDE CALCULATIONS FOR THE NEW ROOF MEMBERS (NOTE 34) AND ROOF DECK (NOTE 26). 4. SHEET A8a; NOTE 26: PROVIDE DECK SIZING AND CONNECTION TO THE ROOF MEMBERS, OR REFERENCE ANOTHER DETAIL, SECTION, OR NOTE FOR THAT INFORMATION. 5. SHEET A8a; DETAIL A: IS THE NEW LINTEL PRE-CAST CONCRETE (PER THE NOTE BELOW THE LINTEL) OR MASONRY (PER THE NOTE ABOVE THE LINTEL AND SECTION A/A8a)? VERIFY. 6. SHEET A8a; SECTION 1: NOTE 21 DOES NOT INDICATE THE GAUGE OF THE STUDS OR THE CONNECTION OF THE METAL STUDS. PROVIDE THAT INFORMATION ON THIS SECTION OR REFERENCE ANOTHER DETAIL, SECTION, OR NOTE FOR THAT INFORMATION. 7. SHEETS A8b AND A8c; KEYED NOTES: SEE THE PREVIOUS COMMENT FOR KEYED NOTE 21. 8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
06/15/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide cleanouts for the horizontal drain of the proper size. 2. Provide temperature control for the lavatories per Section 416.5, IPC 2006. |
06/15/2012 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/15/2012 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
07/23/2012 | CPIERCE1 | WWM | REVIEW | Needs Review | |
07/23/2012 | CPIERCE1 | ZONING | REVIEW | Needs Review | |
07/23/2012 | CPIERCE1 | ENGINEERING | REVIEW | Needs Review |