Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM03429
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/13/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/20/2012 | TERRY STEVENS | ZONING | REVIEW | Denied | Zoning cannot aprove the buliding plan until the Development Package has been approved. |
06/21/2012 | JASON GREEN | ENGINEERING | REVIEW | Approved | Building plan will be stamped for final approval once the DP Package DP12-0090 has been approved. |
06/21/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/25/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide energy code compliance calculations for the additions to the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the additions to the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4, 101.4.3, and 104.2, International Energy Conservation Code 2006. |
06/25/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a plumbing design for the new building sewers being installed as part of this activity. Reference: Section 106.3.1, IPC 2006. 2. Sheet C1.1 shows two proposed gravity grease interceptors being installed; one of which is shown as being located below the new loading zone. Under which activity will these interceptors be installed and what are their specifications? Reference: Section 106.3.1, IPC 2006. 3. Where does keynote #4 on sheet A1.1 occur? 4. Provide roof drainage calculations and plans for the modified building envelope. Show the size, slopes, routing, and termination points for the roof drain and overflow roof drain leaders. Reference: Sections 106.3.1, 1106, and 1107, IPC 2006. 5. Provide cleanouts for the roof drains and roof drain over flows per Section 1101.8, IPC 2006. 6. Show how the existing rain leaders are being modified (i.e. how does the note in detail 2/A1.1, "Relocate rain water leader and jog around door opening" revise the rain water leader.) 7. Clarify the method of roof drainage being employed for the section of roof over the fire riser room and show that overflow protection is being provided. Reference: Sections 1101, 1106 and 1107, IPC 2006. |
06/25/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/26/2012 | GERRY KOZIOL | WWM | REVIEW | Passed | |
06/27/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Passed |