Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM02529
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/17/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Show clearance required for a foward approach to the drinking fountain as required by ICC A117.1, Section 602.2. 2. Up date your toilet signage details and requirements to the 2006 IBC, ICC A117.1, 2003 Edition, Section 703. Signage mounted on the face of the door is not allowed. SHEET T3.0 3. This project requires a health department review. Please provide the Health department's activity number. SHEET A1.4 4. Provide guard rails at the parapet near the roof hatch as required by section 1013.5 if parapet wall is not 30" or more above the roof level or relocate the roof hatch to a point 10' from the edge of the building. SHEET A6.0 5. Provide structural calculations for detail 10. SHEET A8.0 AND A9.2 6. Please provide structural details and calculations for the rug wall construction. a. Please provide approved inspectors for all required special inspections; .i.e. epoxy and mechanical anchors. END OF REVIEW |
05/23/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/01/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/01/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported by the building structure. Reference: Sections 106.3.1 and 301.2, IPC 2006. 2. Provide tempered water for the lavatories using approved devices conforming to ASSE 1070. The proposed Symmons faucet does not appear to conform to ASSE 1070. Reference: Section 416.5, IPC 2006. 3. Revise the water pipe sizing table on sheet P0.0 for the pipes larger than 1" to limit the water velocity to less than 8 FPS for the copper piping. Reference: Table 604.4, footnote (c), IPC 2006, as amended by the City of Tucson. 4. Clarify the size of the branch piping to the water closets. If the 1" fixture connection sizes called out for the flush valves in the Plumbing Fixture Schedule is used for the branch piping, it will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Table 604.4, footnote (c), IPC 2006, as amended by the City of Tucson. 5. Clarify the purpose of the 3-compartment sink in the break room; is it used solely for food preparation or will it also be used to clean serving items (e.g. the coffee airpots that are used daily in the store)? Reference: Section 802.1, IPC 2006. |
06/01/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
06/11/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |