Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM02496
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/08/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A1.0 YL 1. Coordinate the demising wall between the two restaurants and make them the same. A fire rated partition is not required. 2. For an occupant load of 33, separate men and womens toilet are required. Please submit an appeal to the building official for a reduction in the required occupant load as per Table 1004.1.1. 3. The toilet is not accessible as per ANSI 117.1, Section 604.3, water closet clear space requirement. SHEET A2.2 YL 4. At detail 1, provide vertical grab bar as required by ANSI 117.1, Section 604.5.1 SHEET A3.0 YL 5. Please provide structural detailing and calculations for support of the 596 pound, platform mounted water heater. END OF REVIEW |
| 05/08/2012 | RONALD BROWN | ADA | REVIEW | Passed | |
| 05/08/2012 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/09/2012 | TERRY STEVENS | ZONING | REVIEW | Denied | Zoning cannot approve this plan until the development package has been approved. |
| 05/15/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The 2006 International Mechanical Code with Local Amendments is the relevant code for this project (not the CMC). 2. Revise the font size used on the drawings to a minimum of 3/32-inch (upper case and lower case). Reference: Section 106.1.1, IBC 2006. 3. Provide the installed weight of the condensing unit for the yogurt machines. Reference: Section 106.3.1, IMC 2006. 4. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the new roof top units. Coordinate the location of the rooftop units with the plumbing drawings. Reference: Section 302.1, IMC 2006. 5. Show how the water-cooled yogurt machines comply with the requirements of Section 1201.3, IMC 2006, as amended by the City of Tucson. 6. Revise the size of the common condensate drain (i.e. if the condensate drains from two units are combined, the minimum size is 1"). Reference: Section 307.2, IMC 2006 as amended by the City of Tucson. 7. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted, even when the light is turned off during operating hours. Reference: Section 403.2.1 (4), IMC 2006. 8. Provide calculations demonstrating adequate ventilation. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. 9. Show how the water-cooled yogurt machines comply with the requirements of Section 1201.3, IMC 2006, as amended by the City of Tucson. |
| 05/15/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 3/32-inch (upper case and lower case). Reference: Section 106.1.1, IBC 2006. 2. Provide a complete plumbing plan, including water isometrics and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006. 3. Provide a drawing showing the extension of the building drain to its connection to the building sewer. Note that two business establishments may not utilize a shared gravity grease interceptor unless approved by the Authority Having Jurisdiction (i.e. an Appeal to the Building Official is required) and water closets may not drain to a gravity grease interceptor. Reference: Sections 103.2.3, 1014.3.2.2, and 1014.3.4.3, UPC 2006. 4. Clarify the purpose of the "emergency drain through hand valve to FS" and show the piping on the water isometric. Reference: Section 103.2.3, UPC 2006. 5. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 6. Provide a detail of the water heater installation, including the valves, expansion tank, vacuum relief, flue size, flue height, and flue termination. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006. 7. Provide a direct waste connection for the wash and rinse sections of the 3-compartment sink, with an indirect connection for the sanitizing compartment only. Reference: Sections 304.0, 704.3, and 801.2.3, UPC 2006. 8. Appliances (e.g. chemical dispensers, chillers, etc) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Table 6-3, UPC 2006 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 602.3, 603.0, and Table 6-2, UPC 2006. 9. Show how the sanitary drain system is to be protected from fats, oil, or grease (FOG). Whether or not a grease interceptor will be required or not is determined by the Pima County Industrial Wastewater Control Department (contact: Doug Kirkland, 520-724-6202). Provide a letter from the Pima County Industrial Wastewater Control Department confirming that a grease interceptor is not required. Reference: Sections 103.2.3 and 1009.1, UPC 2006. 10. Provide a sediment trap ("dirt leg") for the rooftop units, RTU-1 and RTU-2, and for the water heater, WH-1. Reference: Section 1212.7, UPC 2006. 11. Revise the natural gas piping system notes: the connected loads shall be not less than the maximum hourly input specified by the appliance manufacturer. Reference: Sections 103.2.3, 1209.1.1, and 1209.1.2, UPC 2006. |
| 05/15/2012 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006. |
| 05/18/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM02496 2800 N Campbell #110 1. The electrical plans must be sealed by PE. 2. Provide the existing load on 800 amp service then add loads for Panels A and B for a total. 3.Provide fault current calculations for the 800 amp service and Panels A and B. 4. Sheet E-3 circuits A 26,28,30 should be 20,22,24. 5. Mechanical Plans Examiner requires compliance with IMC 2006 403.2.1. , as air supplied to restrooms it must be exhausted. This must be done even if switch is off. This must be shown on electrical plan as to how it will be done. Ray T Majuta Electrical Plan Review PDSD, City of Tucson 5/18/2012 Ray.Majuta@tucsonaz.gov |
| 05/25/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The DP/Site plan must be approved first. |
| 05/25/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 07/25/2012 | CAGUILA1 | WWM | REVIEW | Needs Review |