Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM02349
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/01/2012 | RONALD BROWN | ADA | REVIEW | Passed | |
05/07/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/09/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/11/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/14/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2006, for mercantile occupancy in the south space. 2. Clarify the water pipe sizing for the North space. The water calculations result in a 12.0 PSI per 100 ft. friction allowance, there is a statement that the pipe will be sized using a 5.0 PSI per 100 ft. friction allowance, and the pipe size chart is based on a 10.0 PSI per 100 ft. friction allowance. In all cases, the 1-1/2" water service pipe is undersized for the existing fixtures. Reference: Sections 106.3.1 and 604.1, IPC 2006. |
05/14/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show how access will be provided for the mechanical equipment serving the south space. Reference: Section 306.5, IMC 2006. |
05/17/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM02349 4380 N Oracle, #100 1. Provide the size of conductors and conduits to be used from new SES to utility transformer. 2.The new SES will require a new grounding system, the existing may be tied to SES, however new will be required. 3. Verify and notate on plan that existing equipment (MDP,L,T,DP,A,B,TL) rated for fault current as fault current shcedules shows. 4. Sheet E-1 shows the transformer is located under panels MDP and DP ? 5. The existing feed to MDP is parallel sets of 600kcmil condutores rated at 840 amps, the fuse size is 400 amps ? 6. Indicate if new fixtures are Full Cutt Off. Ray T Majuta Elect Plan Review PDSD, City of Tucson 5/17/2012 Ray.Majuta@tucsonaz.gov |
05/30/2012 | GERRY KOZIOL | WWM | REVIEW | Approved |