| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/30/2012 | MARTIN BROWN | FIRE | REVIEW | Denied | Too far from existing fire hydrants. Add additional hydrant. See C.O.T. modifications to the 2006 IFC (section 508.5.1) for spacing requirements. |
| 09/04/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. A total occupancy load calculation iof 98 has been shown on the floor plan as derived from the requirements of the 2006 IBC, Table 1004.1.1. Please file for an appeal from the building official if a lesser occupancy load is desired. a. Community Halls are classified as as an "A-3" occupancy as per the 2006 IBC, Section 303.1. b. This facility is not a library and an occupancy load of 1/50 is not applicable. c. Please reaffirm the exiting requirements and the toilet fixture quantities. 2. A completed two part certification for special inspectors has not been submitted with the re-submittal. Please provide one. END OF REVIEW |
| 09/11/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Refer to Section 306.3, IMC 2006 and show the location of the access passageway and service space for the fan coil unit. Provide a note to ensure that the dimensions of the passageway meet the code requirements and are adequate to remove the fan coil from the attic (note that the specified unit is nearly 5-feet long and in one piece). [Original comment: Provide maintenance access for the equipment in the attic in accordance with the requirements of the International Mechanical Code and the manufacturer's installation instructions. Reference: Sections 304.1, 306.3, and 306.3.1, IMC 2006.] 2. Only the drain for the auxiliary pan is shown; a separate condensate drain is required. [Original comment: Show the size, routing, and termination of the condensate drain for the fan coil unit. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006.] 3. As of January 1, 2010, the production and import of HCFC-22 (R-22 refrigerant) for newly manufactured equipment was halted in the United States. Revise the specification for the fan coil to comply with the Federal Regulations and to match with the refrigerant specified for the condensing unit, R410A. |
| 09/11/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved; the site plan provided in this submittal, C1.0, does not show all of the requested information. The water meter and backflow preventer are not labeled on the site plan; the slope of the building sewer and its point of connection to the public sewer are not shown. [Original comment: Provide a utility site plan that shows the locations of the water meter, the water service pipe, the water shut-off valve, the building sewer (including size, slope, and cleanouts), and the approximate location of the connection to the public sewer. Reference: Sections 103.2.3, 605.2, and 713.0, UPC 2006.] 2. None of the requested information was shown on the submitted site plan; is there another site plan? [Original comment: Provide the location, rim elevations, and inverts of the upstream and downstream manholes and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 2006. 3. The maximum flow rates noted on sheet P-1.0 are for residential occupancies and are not appropriate for this activity. Show the maximum commercial (i.e. non-residential) flow rates. [Original comment: The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12, for non-residential use. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp).] |
| 09/14/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1: LA FRONTERA SUNNYSIDE POINTE COMMUNITY CENTER 2: NEED TO BUILD PUBLIC SEWER 3: NEED TO SHOW SIZE & LOCATION OF WATER METER FOR SEWER FEE CALCULATION - CONNECTING WITH 1" COLD WATER LINE TO METER |
| 09/17/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |