Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T12CM01789
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/19/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/20/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise all of the plumbing plans for that have been affected by the new work, including water isometrics and waste and vent isometrics. Show the location of all required cleanouts on the waste and vent isometrics. Reference: Sections 103.2.3, UPC 2006. 2. Show how the new hot water supply will be integrated into the hot water recirculation system. Reference: Section 103.2.3, UPC 2006. |
06/20/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/20/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. exhaust shall run whenever air is being supplied to the restroom during operating hours, even when the light is off). Reference: Section 403.2.1 (4), IMC 2006. 2. Provide calculations demonstrating adequate ventilation for the new area. Reference: Section 403.3, IMC 2006, as amended by the City of Tucson. |
06/22/2012 | FRODRIG2 | WWM | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/22/2012 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |