Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T12CM01307
Parcel: 10510252A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T12CM01307
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/22/2012 STEVE SHIELDS ZONING REVIEW Approved
03/22/2012 LOREN MAKUS ENGINEERING REVIEW Approved
03/23/2012 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Denied NEED AN INTERLOCK OR TIME SWITCH TO CONTROL BATH EXHAUST FAN. IMC 403.2

ARE YOU SURE YOU WANT TO USE 25A AND 45A BREAKERS.....CODE COMPLIANT BUT FREQUENTLY REVISED IN FIELD DUE TO COST.
03/23/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the size, routing, and termination of the condensate drain. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006.
2. Section 403.3, IMC 2006, as amended by the City of Tucson allows the use of the ASHRAE 62-1-2004 ventilation calculation procedure provided that the default occupant densities and combined outdoor air rates are used.
3. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted (i.e. the exhaust runs whenever air is being introduced into the restroom). Reference: Section 403.2.1 (4), IMC 2006.
03/23/2012 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied IBC 2902.2 REQUIRES SEPARATE TOILET FACILITIES FOR EACH SEX.

PROVIDE DETAILS FOR SUSPENDED CEILINGS, SOFFITS, HARD LIDS ETC.

ADD VERTICAL GRAB BAR @ WATER CLOSETS PER ANSI 117.1
03/23/2012 ROBERT SHERRY WATER REVIEW Approved
03/23/2012 LEERAY HANLY ADA REVIEW Passed
03/23/2012 KEN BROUILLETTE FIRE REVIEW Approved
03/23/2012 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
04/05/2012 CPIERCE1 WWM REVIEW Needs Review
04/05/2012 CPIERCE1 PLUMBING-COMMERCIAL REVIEW Needs Review