| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/22/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/23/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 03/23/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/02/2012 | JASON GREEN | ENGINEERING | REVIEW | Approved | Will stamp the building plan approved once the DP Package is approved. |
| 04/04/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET C3.5; DETAIL 2: COMPLETE THE REFERENCE FOR THE DETAIL OF THE NEW RETAINING WALL. 2. SHEET C3.6; ENTRY GATE PLAN: A SECTION CUT 1/C3.7 IS INDICATED AT THE ENTRY GATE. ON SHEET C3.7, 1 IS AN ENTRY GATE ELEVATION. CLARIFY. 3. SHEET C3.6; KEYNOTES: KEYNOTE 2 INDICATES A GUARD BOOTH PER MANUFACTURER SPECIFICATIONS. PROVIDE THOSE ALONG WITH CALCULATIONS AND DETAILS FOR THE CONNECTION OF THE BOOTH TO THE SLAB. 4. SHEET C3.7; SECTION 4: THE SECTION ON THE LEFT INDICATES (6) #4 VERTICALS IN THE UPPER PORTION OF THE COLUMN, WHILE SECTION Y GRAPHICALLY INDICATES (7) #4 VERTICALS. CLARIFY. 5. SHEET C3.8; GENERAL STRUCTURAL NOTES: THE FOUNDATION NOTES INDICATE A SOILS REPORT WAS USED FOR THE FOOTING DESIGN. PROVIDE THAT REPORT FOR REVIEW. 6. STRUCTURAL CALCULATIONS: CLARIFY WHICH CANTILEVERED RETAINING WALLS IN THE CALCULATIONS PERTAIN TO WHICH WALLS ON THE DRAWINGS. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 04/11/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM01545 Salpointe High School North Campus Improvements 1. Sheet E1.1, provide a front elevation detail of how electrical equipment to be situated on wall behind building. 2. Provide a detail of pole base for new lights. 3. Provide information on 500KVA transformer T8, information such as a specification sheet. 4.Conerning the Gaurd House, is this a unit which will be provided with all electrical wiring, panel, equipment complete ? 5.Appears all electrical equipment shown to be new on Sheet E3.0 will be outdoors, indicate NEMA rating. Ray T Majuta Electrical Plan Review PDSD, C of Tuc 4/12/12 Ray.majuta@tucsonaz.gov |
| 04/13/2012 | DAVID RIVERA | ZONING | REVIEW | Denied | Zoning cannot approve the plan until the DP is approved. |