Permit Number: T12CM00597
Parcel: 13804180C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T12CM00597
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2012 KBROUIL1 FIRE REVIEW Approved
03/05/2012 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. As per the 2006 IBC, Table 1004.1.1, your required occupancy load is 1/100 gross which yeilds a total occupant load of 20 for 1,989 a.f.. No need to count your waiting room as assembly.
2. Please provide water dispensers and mop sinks as per sections 1105.9.1 and table 2902.1.
3. Where is door no 112 for exam room 5?
4. Please provide structural calculations for the wall and the wall mounted bracket for the 20 gallon water heater.
END OF REVIEW
03/12/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the size, routing, and termination of the condensate drain for the new rooftop unit. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson.
2. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006.
3. Provide listing information for the clothes dryer to show that the proposed 4" x 4" dryer exhaust duct is sized correctly. Reference: Sections 304.1 and 504.6, IMC 2006.
03/13/2012 ROBERT SHERRY WATER REVIEW Approved
03/13/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Clarify the specifications for the storage-type water heater; keynote 4 on sheet P-1 calls for a 30-gallon tank but the plumbing fixture schedule on sheet P-3 calls out a 20-gallon tank. Reference: Section 103.2.3, UPC 2006.
2. Detail P2/P-3 shows an instantaneous water heater mounted below a sink. Where does this occur? Reference: Section 103.2.3, UPC 2006.
3. The plumbing specifications refer to a vacuum drainage system; where does this occur? Edit the specifications as needed to apply to the work proposed for this activity number. Reference: Section 103.2.3, UPC 2006.
4. Clarify the scope of work regarding the equipment piping. The sheet P-2 shows an instrument air system and a Level 3 medical vacuum system but the general notes on the same sheet imply additional positive-pressure medical gas distribution systems are to be installed. Reference: Section 103.2.3, UPC 2006.
5. Show that the installation of the thermal expansion tank for the water heater complies with the manufacturer's listing requirements (i.e. located on the hot water outlet of the water heater). Reference: Section 310.4, UPC 2006.
6. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
7. Provide listing information for the specified mechanical mixing valve (Symmons model 4-10B) to show that it is capable of sensing and controlling the outlet temperature of the hot water for the lavatories. Reference: Sections 222.0, and 413.1, UPC 2006 and Section 504.3, IECC 2006.
8. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks and urinals require cleanouts regardless of length). Reference: Section 707.4, UPC 2006.
9. Clarify the drain requirements for the "Stericenter". Reference: Section 801.5, UPC 2006.
03/15/2012 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved T12CM00542
675 W Irvington
Retail Store TI

1. Provide 2006 IECC Budget lighting Calculations,ComCheck ok.
2. Provide City of Tucson Outdoor Lighting Code Calculations ,Ord # 10135.

Both 1 and 2 required per Submittal Requirements, C of Tucson.

Ray T Majuta
Electrical Plan Review
PDSD, C of Tuc
3/19/12
Ray.majuta@tucsonaz.gov
03/19/2012 GERRY KOZIOL WWM REVIEW Approved